Have to ask if anyone knows why this is like it is??? Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
Our electrical plan only has the light switch and air conditioning controller, but this still has the conduit box below and it hasn't been patched up at all so wondering if there is something else related to the aircon to go in there???
From what we've researched the panel they have currently there is the upgraded one, so not sure if there would be anything else. We just assumed the painters would fill it up like they did all the other holes etc around wall plates etc but its been left untouched. Very weird.
Have to make a comment here and hopefully we have not made the wrong assumption. OH went to the house this afternoon and there is 3 massive packs of bricks on our verge. We have been speaking to a brickie about getting some planters etc done and he mentioned we were welcome to take bricks left over from his builds. So we kind of assumed it may have been him dumping some off for us. But on closer inspection, there is an invoice attached to the bricks with the delivery address of our block - so now we are thinking Dale Alcock (more specifically our SS) has had them delivered for us after all the bricks we requested to have left over have slowly disappeared to nothing.
An amazing gesture that has absolutely floored us and we are ever so grateful for the thought.
Hi Miss EM,
Your new home looks amazing Sorry to say but the Daikin controller you have installed now is all that you get, we have the exact same one . I think that hole in the wall will need to be patched up.... Mary