Browse Forums Building A New House 1 May 29, 2012 12:17 pm Hi all, We were told last week that scheduling will take 2.5 weeks roughly now i have been told another 3 weeks (month all up)... I am starting to get really anxious, does this seem like the norm..... Redink has not even touched our block..... no red box or anything.... Re: How long from scheduling till movement on block??? 2May 29, 2012 10:27 pm Our situation probably isn't the best to go by, but we've been in scheduling for nearly 10 weeks. We were told 4-6 weeks, if building licence was approved in a timely manner (but you know the saga with that one! ) I would say that 2.5 weeks in scheduling is quite quick...a month seems to more standard, from what I've noticed on the forum. I would say that red box will be turning up very soon for you though It's finally happening! Follow our build with Homegroup WA viewtopic.php?f=31&t=55324&p=987698#p987698 Have look at your house plans and you will probably find that brick articulation joint has been missed. Maximum allowable spacing is 6M or 5.5M for a wall with window… 17 20579 Are they stumps or screw piles ? How much fill is there, is the site a class "P" ? A "H2" site is not supposed to have stumps it is supposed to have grid beams according… 1 6942 House movement is always a potential problem and there is a cause. Yes you should have it inspected by a competent and experienced building consultant 2 7045 |