Browse Forums Building A New House 1 Apr 19, 2012 2:44 pm We are currently building with Ventura Homes. Signed the PPA last year in May 2011 The pre start was smooth and speedy and we did not make any further variation since the prestart. However the council approval was very slow due few mistakes made by Ventura. The sales person defended himself in one time and told us a lie to cover up the problem. Eventually they admitted the problem and fixed it with council. In December 2011 (after Ventura was not able to get the approval after 6 months) I contacted council by myself and pushed them to speed up the approval . In 5 days time the council sent us the letter of approval. Now Ventura made another drawing mistake in their drafting department and they have to resubmit the whole plan with council. Takes another 35 days. What is my legal position in this matter? Re: VENTURA HOMES , WA - After 1 year nothing is happening 3Apr 19, 2012 11:33 pm Do you have their WA number? Re: VENTURA HOMES , WA - After 1 year nothing is happening 4Apr 19, 2012 11:48 pm Building Commission Our office hours are from 8.30am to 5pm, Monday to Friday. Level 1, The MacMahon Building 31 Troode St WEST PERTH WA 6005 Phone: 1300 489 099 Fax: (08) 9476 1333 Email: bcinfo@commerce.wa.gov.au Postal Address: Locked Bag 12 WEST PERTH WA 6872 Your house roof does not show rusting other than some surface rust on the flashings. In my opinion you dont need to replace or paint the roof other than treat surface rust… 1 10207 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 74701 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 105544 |