That was my concern that they would get them wrong the second time, but they were very good. Paul was excellent at wording the changes as well so they couldn't make a mistake.
I made sure that all the changes - we had more than your 4 went back on an excel spreadsheet with them all numbered and then the changes were numbered on the plans - fool proof
Jen we have 20+ changes. Mainly adding/deleting windows/doors and adjusting the sizes of the windows/doors. I did the same as you. Plan numbered with changes and supported with a spread sheet. No internal changes done yet as our CSO has specifically asked not to do internal changes now and they can be done later. And our CSO said they are straight away doing the plans for DA with changes to save the time. hmmm and that we can check at that time. or we can still get plan with 3 weeks turnaround. Should I wait 3 weeks and get the second issue of plans with changes or wait for DA plans to check?