Browse Forums Building A New House Re: Porter Davis Upgrades and Costs 10Apr 20, 2012 1:45 pm Building a Delta 21 at Craigieburn - http://homeofzero.blogspot.com.au/ Deposit: 26/02. Contract: 22/05. Settlement: 29/05. Site start: 18/10. Re: Porter Davis Upgrades and Costs 15Jun 25, 2012 8:18 pm All our upgrades are based on the montague 21 with living, ihub, Extended kitchen and grand alfresco option Provide Home Theatre in lieu of living including: 4000mm plastered stud wall in lieu of standard opeing with 2040mm high x 820mm wide and 2040mm high x 520mm wide flush panel doors $810 Provide 2100mm x 1800mm wide aluminium fixed window to family in lieu of brick work $127 Provide 2040mm high flush panel grooved cavity sliding door in lieu of stanard opening to ensuite $388 Provide 2040mm high flush panel grooved cavity sliding door in lieu of stanard opening to laundry $198 Provide 2100mm high x 3600mm wide aluminium stacker door to the family/ alfresco wall in lieu of the standard 2100mm high x 2400mm wide sliding door $547 Provide 20mm caesar stone cat 2 to bathroom in lieu of standard $241 Provide 20mm caesar stone cat 2 to Ensuite in lieu of standard $504 Provide 20mm caesar stone cat 2 to kitchen island in lieu of standard $1162 Provide 20mm caesar stone cat 2 to kitchen benchtop in lieu of standard $2307 Provide AFA Cubeline double bowl undermount sink to kitchen in lieu of standard $1124 Provide ceiling mounted dumper 200mm with mizu 1500 shower mixer to ensuite shower $409 Provide stepeco underlay in lieu of steplight underlay $248 Provide unique 1 strip timber flooring (level 3 spotted blue gum) in lieu of promotional flooring to kitchen, pantry, dining and family areas $5650 minus $2150 for credits for not using standard belero flooring Removing 2000l water tank provided due to estate coveninent gave us $3447 to buy a better slim line on from slimtank.com.au which was $1300 Provide broom cubboard in the linen 400mm wide top shelf to remain full $55 Flume rangehood to external in lieu of roof space $434 Provide capped cold water point to fridge recess and widen space from 900mm -1000mm $126 Provide capped gas point to Alfresco roof $189 Provide capped gas point to Alfresco to external kitchen wall $189 Upgrade Gas line to whole house $447 Provide a bank of draws to ensuite cabinets $182 I think that was about all of it there are other ones for taps and stuff like that but i wont put them up unless you guys want hope this all helps Building the Montague 21 by Porter Davis at The Estuary, Leopold. Our Blog: http://porterdavismontague21.blogspot.com.au/ Re: Porter Davis Upgrades and Costs 16Aug 02, 2012 10:35 am BUMPing for all the newbies in the PD thread ![]() Re: Porter Davis Upgrades and Costs 17Aug 02, 2012 1:39 pm This is really useful. Gives others time to consider options and budgets, so thanks everyone. Has anyone had a fireplace with mantle installed? Would love to know the cost of this ( tho I am aware different size heaters and materials used for mantle will alter costs). Re: Porter Davis Upgrades and Costs 18Aug 04, 2012 3:06 am Provide jetmaster fireplace with limestone mantle $11300 It depends on which mantle you choose. There are cheaper mdf ones. Basically the price of the heater with the provision is about $8500 without a mantle The price of the marble mantle alone In the waldorf 48 at berwick is approx $8500 We went to jetmaster and spoke to the lady. She was wonderful and full of information. I would suggest you visit the showroom in you are interested. Re: Porter Davis Upgrades and Costs 19Aug 04, 2012 7:15 am ![]() Provide jetmaster fireplace with limestone mantle $11300 It depends on which mantle you choose. There are cheaper mdf ones. Basically the price of the heater with the provision is about $8500 without a mantle The price of the marble mantle alone In the waldorf 48 at berwick is approx $8500 We went to jetmaster and spoke to the lady. She was wonderful and full of information. I would suggest you visit the showroom in you are interested. Thanks. I figured the limestone mantle would be very pricey - should be able to have one installed as we've budgeted 10K for it. Was there a specific showroom you went to? Having just completed our first/only build and we spent so much money on insulation and double glazing upgrades - do not skimp on insulation including upgrade to anticon… 1 9312 Hi Ponzutwo, Thank you for replying back. Our sales consultant is on leave and will be back on Monday. I have created a list of questions for her but I just thought I'll… 2 6684 'P' is a site classification not a soil type, it is simply a heads up to the engineer designing the foundation that there is a Problem that needs to be taken into account… 1 11681 ![]() |