So flooring could be trouble. Hmm
You will need to provision some costs for flooring and tiles as the underlay they give you is very basic and tiles are basic as well.
Kind Regards,
Bruce
"Building an Eden Brae Waldorf 50 in North Kellyville"
Blog: http://waldorf50.blogspot.com.au
Thanks Bruce.
Start looking at where I can save any .. if...
Marina 37 is 389000, our rough guess at this stage is 457000.. which is already 70000 k more than original price. I don't have much room to grow.
Not sure if this helps you at the stage you are at currently, but before we went to tender, we visited HOG, Di Lorenzo and PGH to find out what was standard. This really helped our budget as then we knew what was important for us to upgrade on and what standard inclusions we liked.
For info, our base price for Lincoln was 324k and after upgrades came to $410k (this was back in 2015). And we made a few structural changes that were negotiated for within the tender. Imo it really is important to sit back and think, do I really need this? Is this something that I can live with for the next 5-10 years and then upgrade? Helps to keep the costs down and not go overboard or over budget. Good luck.
[/quote]
That is a really good tip. I should get information from sales person and go and check standard range. Thank you very much.