Browse Forums Building A New House 1 Feb 01, 2012 2:52 pm Anyone Can give us some suggestion what can we do now?? Had a lot of issues with sterling building a new house. After handover we found they didn't build the exit fan through the wall as we asked,which cost us $900more,neither thOugh the roof! Now they said either refund only $300 or send someone to fix it only to the roof. Excuse me???they actually didn't finish the work on the contract!!shall we sue them?is it breach of contract??? Really getting mad since Dec handover never stopped arguing.left shower screen undo before X'mas and the manager told me it's OK u can still use it!what the hell!?i asked him if he had such a bathroom in his house??then he kept silent. Hope to get some suggestion ASAP!Thx a lot everyone!!! 3rd property but 1st home March 19,2010 signed contract Re: HELP!!!Damn Sterling SA 2Feb 01, 2012 3:27 pm If its in the contract you have grounds to make them fix it.. thats their problem for costs.. Is it in writing and signed off in the contract?? Building in Adelaide, SA Slab poured 08/09/2011 Handover 18/01/2012! WORLD CONCEPT HOMES Our build thread: viewtopic.php?f=31&t=44725 Re: HELP!!!Damn Sterling SA 3Feb 01, 2012 8:50 pm Yes it is written in the contract.now they just finding the excuses saying there's problem to get through the wall. if we didn't ask,they won't refund any money to us. 3rd property but 1st home March 19,2010 signed contract Re: HELP!!!Damn Sterling SA 4Feb 01, 2012 9:31 pm They def need to find a way to figure it out! At the very least refund you what you were supposed to pay for it!! Building in Adelaide, SA Slab poured 08/09/2011 Handover 18/01/2012! WORLD CONCEPT HOMES Our build thread: viewtopic.php?f=31&t=44725 Re: HELP!!!Damn Sterling SA 5Feb 02, 2012 10:30 am OMG how horrible. We need to contact them as we have had some substansial cracking in the front door and all the window ledges and general joinery in the house, more then hairline settlement cracking. I am not looking forward to contacting them as we still have outstanding items to be fized from hand over. I feel for you as you have had problems from the start. My suggestion would be to speak to someone as high as possible or cantact a building commission. Re: HELP!!!Damn Sterling SA 6Feb 02, 2012 4:16 pm newbuilder1 OMG how horrible. We need to contact them as we have had some substansial cracking in the front door and all the window ledges and general joinery in the house, more then hairline settlement cracking. I am not looking forward to contacting them as we still have outstanding items to be fized from hand over. I feel for you as you have had problems from the start. My suggestion would be to speak to someone as high as possible or cantact a building commission. We have talked to the boss who is very rude,pointing his finger to me and my 4months baby today! saying we should make it clear in our head what we want?omg!i was about to call the police!!! They will just give excuse to u!! Pls remember to be tough! I really need to sue them as we got it in the contract. Good luck!! 3rd property but 1st home March 19,2010 signed contract Hi there, long-time lurker but first time posting. I've bought a house 2 and a bit years ago and last year we had some major water damage on a converted pergola area… 0 7949 Yes, unless you are in a low intensity rainfall area or the area is protected from rain. Do you have access to NCC Part 2 or can you download it? I can email you a copy… 10 12550 Thankyou so much 😀 I've decided on White on white for doors and trims, White on white 50% on ceiling and Mt buller for walls. Fingers crossed it will look OK 😀 2 7216 |