Browse Forums Building A New House Re: Our Lindeman 28 - Home Stretch 101Apr 26, 2012 12:20 pm http://lindeman28.blogspot.com - Our building blog Re: Our Lindeman 28 - Home Stretch 102Apr 27, 2012 2:33 pm http://lindeman28.blogspot.com - Our building blog Re: Our Lindeman 28 - Home Stretch 103Apr 27, 2012 3:20 pm Orchid 4200 with Burbank: Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=53034 House Built in 7 Months and 2 weeks Re: Our Lindeman 28 - Home Stretch 104Apr 27, 2012 8:56 pm http://lindeman28.blogspot.com - Our building blog Re: Our Lindeman 28 - Home Stretch 105May 19, 2012 10:32 am http://lindeman28.blogspot.com - Our building blog Re: Our Lindeman 28 - Home Stretch 107May 19, 2012 3:20 pm http://lindeman28.blogspot.com - Our building blog Re: Our Lindeman 28 - Hand over end of may 108May 20, 2012 10:17 pm Orchid 4200 with Burbank: Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=53034 House Built in 7 Months and 2 weeks Re: Our Lindeman 28 - Hand over end of may 109May 22, 2012 1:18 pm Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Our Lindeman 28 - Hand over end of may 110May 22, 2012 5:59 pm http://lindeman28.blogspot.com - Our building blog Re: Our Lindeman 28 - Hand over end of may 111May 24, 2012 11:49 am Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Our Lindeman 28 - Hand over end of may 112May 25, 2012 8:29 am http://lindeman28.blogspot.com - Our building blog Re: Our Lindeman 28 - Hand over end of may 113May 25, 2012 8:58 am For info on our build: viewtopic.php?f=31&t=43093 Built the McLaren by Dechellis - slab down 22 Feb - handover 30 Aug 2011 - and gardens finished 9 Dec 2012!! Re: Our Lindeman 28 - Hand over end of may 114May 25, 2012 9:32 am We did ours in the rain, we didnt go outside we left that up to our private inspector. Although inspecting inside on a dark day makes it really hard to see paint defects, just turn on all lights and look for every little ding or scrap. Good luck today Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Our Lindeman 28 - Hand over end of may 115May 25, 2012 9:35 am Should take a torch so you can see everything .... it makes such a difference For info on our build: viewtopic.php?f=31&t=43093 Built the McLaren by Dechellis - slab down 22 Feb - handover 30 Aug 2011 - and gardens finished 9 Dec 2012!! Re: Our Lindeman 28 - Hand over end of may 116May 25, 2012 9:39 am Go idea Mclaren! Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Our Lindeman 28 - Hand over end of may 117May 25, 2012 7:34 pm PCI went well with only 14 minor defects found by our inspector. Most stuff is just paint touch ups and settlement is looking good for the end of the month http://lindeman28.blogspot.com - Our building blog Re: Our Lindeman 28 - Hand over end of may 118May 29, 2012 9:23 pm Well we were ment to have settlement on friday but apparently all our internal doors are faulty and need to be replaced (this is a large supplier problem). Hoping to settle next wednesday now. Was ment to hear from site manager today but he didnt ring. Its a case of having the 5 days time so the bank can sort themselves out but our builder cant issue the final invoice until the doors are sorted. http://lindeman28.blogspot.com - Our building blog Re: Our Lindeman 28 - Hand over end of may 119May 30, 2012 10:15 am That sucks but at least it will be all fixed soon! We had our final invoice before PCI! lol Forrestdale 27 Land Titled:4/11/11 Building Permit:4/11/11 Site Start Date: 16/11/11 Slab Date: 01/12/11 Frame Date:05/12/11 http://hordefamilyhome.blogspot.com/ Re: Our Lindeman 28 - Hand over end of may 120Jun 09, 2012 6:32 am Well we moved in on thursday the 7th. Hand over went well and we havent been more excited before! Such a big task moving in and doing stuff around the place. I have no idea how people renting build or even do it with a baby or kids! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ http://lindeman28.blogspot.com - Our building blog If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 17640 I engaged my builder in December last year and we’ve been working on preliminary drawings for last couple of months. I got a call from the salesperson this morning… 0 11184 Minimum overhang into gutter must be 50mm, turn down tool should not split the sheet. it seems wrong tool for the profile was used, the flashing cannot slope back. Rib… 2 8891 |