Soil Tests & Slab Types
Page 1 of 1
I've since heard that for an M class soil if you use a raft slab screw piles aren't necessary. Therefore a hell of a lot cheaper than the $30+k that our site costs have come in at.
We are really, really set on this house design and want to stay with our current builder, but if we need to have this waffle pod/screw pile slab we just can't afford it...we were'nt expecting thsi cost blowout!
Can you get a different slab type...or do these large building companies only offer one and thats your choice or you don't go with them? Anyone know of any major building companies that do NOT use waffle pod slabs????
You do not have standard M-class soil with shallow moisture changes/movement, you have M-D class soil which means you will have moderate soil movement at greater depths - sounds to me like you do not have good solid clay or even rock at a sufficiently shallow depth to support the footings of the house so the screw piles are needed to provide additional support.
Slabs aren't like something you'd buy in a store I'm afraid - if your soil is reactive and there isn't a solid subsurface soil structure or rock to support the house then burying the slab footings into the ground (which is what a raft slab involves) isn't going to help much because the soil below still won't be able to support the house.
Regardless of which slab type is used I suspect those screw piles will still be needed if the soil classification is correct.
Appreciate your reply.
eagerly awaiting this 2nd soil test now..
Related
28/09/2023
8
We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before…
12/07/2023
1
DIY, Home Maintenance & Repair
I'm in WA and our sandy soils make drainage a bit easier but this is what I'd be doing. Dig down to your footings and let the wall dry out. Clean it all well by brushing…
24/07/2023
3
Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report