Browse Forums Building A New House Re: Metriicon SA build - Modified Santorini 26 - SLABBED!! 22Mar 27, 2012 8:10 am YOU'VE BEEN SLABBED!!! CONSLABULATIONS!!! http://i165.photobucket.com/albums/u71/thiland/dancingmickey.gif For info on our build: viewtopic.php?f=31&t=43093 Built the McLaren by Dechellis - slab down 22 Feb - handover 30 Aug 2011 - and gardens finished 9 Dec 2012!! Re: Metriicon SA build - Modified Santorini 26 - Frame compl 23May 15, 2012 1:33 pm Hi Rigby We're looking at building with M, had an initial meeting with them last night. I was wondering how have you found them to deal with? So far they seem enthusiastic etc but I just was wondering if that continues once things get started? Your plans look amazing! I will certainly be checking out your blog later! Land Settled 2/11/11 Selections 24/9/12 Contract Signed 31/10/12 Site Works 17/1/13 SLABBED 29/2/13 Lock Up 11/4/13 PCI 22/5/13 Handover 3/6/13 http://w/w/w.project-buildahouse.blogspot.com Re: Metriicon SA build - Modified Santorini 26 - Frame compl 24Sep 22, 2012 9:56 am Hey Rigby where are the internal pictures Initial Deposit 28/09/2012 // Prelim Contract Signed 25/11/2012 Selections 21/1/2013 to 23/1/2013 // Contract Signed 22/2/2013 Site Start 21/5/2013 // Slabbed 30/5/2013 Re: Metriicon SA build - Modified Santorini 26 - Frame compl 25Oct 20, 2012 7:02 am Hi Rigby Great to see some positive feedback on M !! We are a weekend away also on deciding on Santorini and reading your post and seeing the pantry redisign I almost feel i have plagiarised somewhat as we did almost the same but had our fridge alcove out in there also. We are deciding to two Builders and leaning towards M and this feedback is very useful so thanks for the ongoing updates. Surely there has been some hiccup or have you been xxx on the ... by a fairy and had a dream run !!! Any hints you can give us when it comes to final negotiations on the pricing document, feel free to PM us with any hints and tips you can provide......only reading your post I had forgot to get capped water point for the EVAC and also a Gas point for the Ducted Heating......M had never bought this to our attention either...anyway say Variation !!!! Look fwd to see the build unfold Rigby !!! Deposit Paid 31/10/12 Selections 25/1/13 NHC 28/2 DCA 20/3 Siteworks 2/5 Slabbed 20/5 Wall Frames 3/6 Brickwork Finished 2/7 Lock Up 19/7 viewtopic.php?f=31&t=58864 This is 100% true. You can not hang anything on steel frames. very frustrating 8 8011 This certainly doesn't look good. I would be engaging with an independent inspector to have a look at this. As for the unscheduled site visits, most builders are quite… 1 28312 Hi, I have a steel frame house which was built 2 years ago. When you are down stairs you can hear clunking noises when someone is walking around. We were told if you… 0 4451 |