Browse Forums Building A New House 1 Oct 12, 2011 11:56 am Hi All, Just did site inspection and noticed tiles all done gas,electrical and other pre lays done. One thing I noticed which lucky I was on site to pick up was that electrician stuffed up put 25mm conduits instead of 32mm which is what was in contract. So they are fixing it. So what is next stage post roof tiles, so far I know plastering. Just want to know what to look forward to. Regards The concreter will take and reuse. In my case I bought structural LVLs and scraped them back and used them as joists. 1 5160 We were lucky in that our old house was so small (86 square metres) compared to the new house, they were able to take enough readings around the old backyard house before… 8 37150 you need to understand the breakdown of warranties. 90 warranty is considered as minor defects rectification period where as the longer ones are more major/structural… 1 5351 |