Browse Forums Building A New House Re: Porter Davis homes 6086Sep 14, 2012 10:22 pm mitroff Hi Rups, Congratulations on your baby Girl, she is gorgeous I had a look at your blog and must admit your house looks awesome. I love your choice of furniture, lights and all the other smaller details that make your home beautiful and warm. You've done well Also, if I can please have the contact details of your electrician that did all the post handover work for you, it would be much appreciated. It is very hard now days to find a trustworthy and reliable electrician. Thank you and all the best for the future Hi Mitroff, I've sent you a PM with his details. Re: Porter Davis homes 6087Sep 15, 2012 12:02 am J & C Can someone please let me know, if the land outside the house is flattened and free of debris at handover. Hey I asked SS to clean up the site at PCI as there were broken broken wall tiles, and such everywhere. I still ended up with a few bags of rubbish and some scaffolding which was kindly deposited at the nearest PD site. Although they did leave me (as my request) the last pallet of bricks. As for levelling, once the site scrap is done and slab poured, nothing else will happen with the levels. That'll be your issue to resolve:-( However, if you have any landscaping packages, they might if you follow up with their landscaping contractors early. Thanks Mikey Re: Porter Davis homes 6088Sep 15, 2012 12:32 am we've had our final inspections and have been informed that are floors were not leveled before tiling and also a window is not on level. Has anyone been in a similar situation...how was it resolved. Re: Porter Davis homes 6089Sep 15, 2012 1:06 am Our frames have started to go up!! Refer to blog for more details! Its amazing how fast PD is working on our site! Sorry for all those who haven't made progress on your building, maybe our tradies are heading over to yours sometime next week! Well, our independent supervisor had a look at our slab after its been poured and he's said that all is level and the slab was within tolerable range. Im wonder what this range is, anyone have any ideas? Also, I've noticed that some of the outlet pipes or down pipe usually have a tape over it. Im worried that some of them may have been broken off or damaged during the build. What is it gets clogged up during the whole building process? I've read on the forum that some people are finding that AFTER they've moved into the house, their toilets get clogged, and their showers are not working etc. Any suggestions how I can prevent this from happening, or rather, should I get someone to go check on the pipes now?! Finally, with the solar hot water panels. We have ours drawn on the drawings facing the Western sun. From some research I believe the system should be facing a Northern sun preferably. Would the solar panel guys coming out know what to do or will they just mount it to whatever specs the drawings have done?! Re: Porter Davis homes 6090Sep 15, 2012 4:08 pm Rups mitroff Hi Rups, Congratulations on your baby Girl, she is gorgeous I had a look at your blog and must admit your house looks awesome. I love your choice of furniture, lights and all the other smaller details that make your home beautiful and warm. You've done well Also, if I can please have the contact details of your electrician that did all the post handover work for you, it would be much appreciated. It is very hard now days to find a trustworthy and reliable electrician. Thank you and all the best for the future Hi Mitroff, I've sent you a PM with his details. Hi guys, I was also hoping you may pass on your electricians details? Porter Davis homes 6092Sep 15, 2012 8:27 pm Lisjac Rups mitroff Hi Rups, Congratulations on your baby Girl, she is gorgeous I had a look at your blog and must admit your house looks awesome. I love your choice of furniture, lights and all the other smaller details that make your home beautiful and warm. You've done well Also, if I can please have the contact details of your electrician that did all the post handover work for you, it would be much appreciated. It is very hard now days to find a trustworthy and reliable electrician. Thank you and all the best for the future Hi Mitroff, I've sent you a PM with his details. Hi guys, I was also hoping you may pass on your electricians details? Hi Lisjac, I've sent you a PM Porter Davis homes 6093Sep 15, 2012 8:28 pm humble Been in our house for 9 months, had hotwater system stolen overnight.. wtf.. That sucks! Did you have it behind a side gate? Were you able to get it replaced today? Re: Porter Davis homes 6094Sep 16, 2012 2:22 am Rups humble Been in our house for 9 months, had hotwater system stolen overnight.. wtf.. That sucks! Did you have it behind a side gate? Were you able to get it replaced today? Yup. Behind a gate. Albiet unlocked (not any more) Yer we did.. $1550 installed (mate is plumber) it was just the gas booster and the ingnitor. Hope the insurance will pay out. Re: Porter Davis homes 6096Sep 16, 2012 6:32 pm gabster Our frames have started to go up!! Refer to blog for more details! Its amazing how fast PD is working on our site! Sorry for all those who haven't made progress on your building, maybe our tradies are heading over to yours sometime next week! Well, our independent supervisor had a look at our slab after its been poured and he's said that all is level and the slab was within tolerable range. Im wonder what this range is, anyone have any ideas? Also, I've noticed that some of the outlet pipes or down pipe usually have a tape over it. Im worried that some of them may have been broken off or damaged during the build. What is it gets clogged up during the whole building process? I've read on the forum that some people are finding that AFTER they've moved into the house, their toilets get clogged, and their showers are not working etc. Any suggestions how I can prevent this from happening, or rather, should I get someone to go check on the pipes now?! Finally, with the solar hot water panels. We have ours drawn on the drawings facing the Western sun. From some research I believe the system should be facing a Northern sun preferably. Would the solar panel guys coming out know what to do or will they just mount it to whatever specs the drawings have done?! hi gabster, we were told by our inderpendent inspector that 6mm was the tolerable range, ours was 10mm out in certain areas. its been a abousolte headache trying to get it straight before they laid the tiles. Thankgod we have a good s/s and he was not prepared to lay tiles down until it was right. Re: Porter Davis homes 6097Sep 16, 2012 7:08 pm hi guys well got news this week that our PCI is on the 8th october. so looking forward to all happening now, lets hope it all goes well. Update blog also.... Re: Porter Davis homes 6099Sep 17, 2012 8:38 am humble Rups humble Been in our house for 9 months, had hotwater system stolen overnight.. wtf.. That sucks! Did you have it behind a side gate? Were you able to get it replaced today? Yup. Behind a gate. Albiet unlocked (not any more) Yer we did.. $1550 installed (mate is plumber) it was just the gas booster and the ingnitor. Hope the insurance will pay out. your have had bad luck... hope insurance pay it out for you Re: Porter Davis homes 6100Sep 17, 2012 8:42 am ma2531 hi guys well got news this week that our PCI is on the 8th october. so looking forward to all happening now, lets hope it all goes well. Update blog also.... Looking good ma! Your place looks to have come along in leaps and bounds since your last update, although I guess that's the difference that something like tiles can make! You can really see the finished product coming together. Hi there! Putting the feelers out there for those who have (or almost) built with Arli homes! Interested in your experiences who've built from their stock home designs… 0 75642 3 72596 |