Have had our 3 month inspection and most things fixed. Still to be fixed our entry wall that is over 10mm out of plum and a continuing stinking toilet in our powder room.
Complained about our paint as after 3 months will have to repaint due to not being able to clean up Marks on the paint. PD inspector said what did we expect as PD are a volume builder and they use cheap paint. If we wanted paint we could wash we should have upgraded!!!!!
Some other items below. The garage has now been ground and sealed, concrete is in for the spa and I have made a fixture to weld myself a blade fence.
Still fighting with the council to get my driveway bond back. The concreters did an excellent job on the driveway. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
see more About the hoffman – Building the hoffman
https://hoffmangoldwithporterdavis.wordpress.com/about/
Re driveway bond we just had someone out last week to redo a part of the crossover and throw down top soil and grass seed on the nature strip so that PD could get their bond back from council. Our neighbour built with Carlisle and he had to pay the bond. There’s no consistency.