Browse Forums Building A New House Re: Porter Davis homes 14878May 10, 2017 12:05 pm 9528 Hi Walks, Thanks for the heads up. That's why I didn't sign off last week. Since we are on pricing, I only spotted an item under Electrical, Provide telecommunications infrastructure connection to home. $593.00. It's nowhere on WOS Electrical selections. I asked what was that for and was told that it's the same charge for every PD new built. Can I ask whether you have been charged the same? Thanks guys I'll have to check but from memory it was included on my fixed site costs under estate requirements or something similar. I will check though. Re: Porter Davis homes 14879May 10, 2017 12:22 pm walks 9528 Hi Walks, Thanks for the heads up. That's why I didn't sign off last week. Since we are on pricing, I only spotted an item under Electrical, Provide telecommunications infrastructure connection to home. $593.00. It's nowhere on WOS Electrical selections. I asked what was that for and was told that it's the same charge for every PD new built. Can I ask whether you have been charged the same? Thanks guys I'll have to check but from memory it was included on my fixed site costs under estate requirements or something similar. I will check though. Yes we had a range of charges in that section Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Re: Porter Davis homes 14880May 10, 2017 1:26 pm 9528 Hi Walks, Thanks for the heads up. That's why I didn't sign off last week. Since we are on pricing, I only spotted an item under Electrical, Provide telecommunications infrastructure connection to home. $593.00. It's nowhere on WOS Electrical selections. I asked what was that for and was told that it's the same charge for every PD new built. Can I ask whether you have been charged the same? Thanks guys We had that on our sales quote but it got taken off by tender as we are building in a new estate with Opticom so we got charged for Opticom instead of the $593. Sounds like it is pretty standard though. Building a Kew 28 with Porter Davis Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12672 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 75374 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 106255 |