Browse Forums Building A New House Re: Porter Davis homes 14788May 01, 2017 2:23 pm The drawings in our contract don't have sizes for the island, they are just in the KC drawings. Re: Porter Davis homes 14789May 01, 2017 3:41 pm nikil The drawings in our contract don't have sizes for the island, they are just in the KC drawings. thats strange, ours have measurements all over our drawings for each wetroom and kitchen in our final contract. has all of your KK stuff been finalised? .2 of a mm difference to ours haha Re: Porter Davis homes 14790May 01, 2017 3:47 pm lizbf85 nikil The drawings in our contract don't have sizes for the island, they are just in the KC drawings. thats strange, ours have measurements all over our drawings for each wetroom and kitchen in our final contract. has all of your KK stuff been finalised? .2 of a mm difference to ours haha Our drawing of the whole house doesn't have any measurements for the kitchen island either, it's only our KC drawings that have this. Building a Kew 28 with Porter Davis Re: Porter Davis homes 14791May 01, 2017 3:48 pm Yep kitchens all finalised but it was finalised a day after the contracts were signed so maybe that's why it's not on there? Re: Porter Davis homes 14792May 01, 2017 3:49 pm Hurrow lizbf85 nikil The drawings in our contract don't have sizes for the island, they are just in the KC drawings. thats strange, ours have measurements all over our drawings for each wetroom and kitchen in our final contract. has all of your KK stuff been finalised? .2 of a mm difference to ours haha Our drawing of the whole house doesn't have any measurements for the kitchen island either, it's only our KC drawings that have this. They have probably changed their format, esp if two diff documents are showing two different measurements. They have probably been caught out with that! Re: Porter Davis homes 14793May 01, 2017 3:50 pm Hurrow lizbf85 nikil The drawings in our contract don't have sizes for the island, they are just in the KC drawings. thats strange, ours have measurements all over our drawings for each wetroom and kitchen in our final contract. has all of your KK stuff been finalised? .2 of a mm difference to ours haha Our drawing of the whole house doesn't have any measurements for the kitchen island either, it's only our KC drawings that have this. We are at frame stage and our contract drawings say "Refer to Kitchen Culture" on those wet area pages so they don't use the contract for building the kitchen. They only use the official Kitchen Culture drawings to install it. Re: Porter Davis homes 14794May 01, 2017 3:51 pm nikil Yep kitchens all finalised but it was finalised a day after the contracts were signed so maybe that's why it's not on there? not sure, i wouldn't worry it seems like its a new thing. any word on your second soil or submission to council? Re: Porter Davis homes 14795May 01, 2017 3:52 pm lizbf85 nikil Yep kitchens all finalised but it was finalised a day after the contracts were signed so maybe that's why it's not on there? not sure, i wouldn't worry it seems like its a new thing. any word on your second soil or submission to council? Emailed the BC today to see if she got the soil test report and got an out of office message saying she is on leave and back in the office tomorrow, so no updates yet unfortunately ☹️ Re: Porter Davis homes 14796May 02, 2017 10:26 am I'm hoping to hear back from BC today that they have received the soil report. Does anyone know how long it will take from receiving the soil report to being ready to submit plans to council for approval? Re: Porter Davis homes 14797May 02, 2017 11:10 am And the problems just keep on coming... I received a call from Kitchen Culture. Apparently the color that we wanted for our island bench doesn't come in the silk finish that we got the whole kitchen in. Our site started today and today they call to let me know. We went with that specific profile because that was the only profile that goes with the color we wanted and NOW they figure out it's not in the same finish.... I'm just too upset for words right now. I will not sign the new documents until they find a different solution for us. We upgraded everything in the kitchen to have it perfect and now this. Re: Porter Davis homes 14798May 02, 2017 11:15 am How frustrating!! How is it only now they realised this. Surely when you had your KC appointment it should have been picked up then. Put it on them and tell them to fix it or upgrade you to something that you are happy with and they can foot the bill. Tell them at this stage you have designed things around that specific kitchen and it's their fault for not letting you know sooner. Re: Porter Davis homes 14799May 02, 2017 11:17 am Naama And the problems just keep on coming... I received a call from Kitchen Culture. Apparently the color that we wanted for our island bench doesn't come in the silk finish that we got the whole kitchen in. Our site started today and today they call to let me know. We went with that specific profile because that was the only profile that goes with the color we wanted and NOW they figure out it's not in the same finish.... I'm just too upset for words right now. I will not sign the new documents until they find a different solution for us. We upgraded everything in the kitchen to have it perfect and now this. How on earth have they not figured out that they don't have the right materials until now??? I hope they come to the party with some decent alternatives for you, even so it's a hassle having to go and choose new stuff and then hope that they have that in stock! Building a Kew 28 with Porter Davis Re: Porter Davis homes 14800May 02, 2017 12:19 pm UPDATE: So they called me again from KC and they talked to the cabinet maker and they can do the finish that we want... for some reason they have it in their system as unavailable but it is actually available.... hmmmm right hand don't know the left thing is a theme in this process... oh well, I'm breathing again... thank you for letting me vent here, you guys are the best!! Three options 1 Ask the liquidator 2 Find another PD customer and ask the source of their report 3 Pay for new report 3 12791 Ask for references and speak to them. If they are defensive or try to avoid the request, walk. 1 75680 I would never build with Fowler homes. I built with them in 2021 and till date maintenance issues are pending. All their existing trades and businesses don't work with… 14 106450 |