Inspection went well on Wednesday. The supervisor ran out of room on his sheet of thing to fix and had to start another. Even though it looked like alot, all were very minor things.
The one thing that did bug me and the supervisor is that it looks as though the window glazier was drunk or at least hungover the day the cut the glass to go into the frames as 4 panes on the sliding windows were all to short and had gaps in them so that you could move the glass around, the supervisor was ropeable, but they have alrady been fixed, and the supervisor even added things that i thought were ok to be fixed.
all in all the house took 22 weeks from slab down to practical completion (including a 2 week break over christmas and new years) which is very fast for WA .So we get the keys on the 30th, how happy am i ????