With the lease I would contact the leasing agent and try to be on a month to month? I haven’t had this experience. We had 2 weeks to spare lol. Pretty close



SnowLeopard
Good to hear you're getting the refund. How much extra did they charge if you don't mind me asking?

Definitely check, you have every right to know what you're getting. You are the one paying for it. I asked a thousand questions and our build didn't even start yet, haha..

They charged around $8,000 extra for screw piers
After signing the tender with Clarendon in Feb 2017, we have now been handed over to construction!! (delays were cos of our land registration so Clarendon's delays suited us fine).

Just wondering how long did it take from the time when you were told you were going off to construction to when your slab was poured? I'm not sure when "Day 1" is supposed to start heh. I'll hopefully be updating my blog more frequently now that we are in the build process!
k3nnis
With the lease I would contact the leasing agent and try to be on a month to month? I haven’t had this experience. We had 2 weeks to spare lol. Pretty close


Alright the SM finally answered our call and we been told that the PCI will be in 1st week of April - super stoked!
Buildingourfirstnest
After signing the tender with Clarendon in Feb 2017, we have now been handed over to construction!! (delays were cos of our land registration so Clarendon's delays suited us fine).

Just wondering how long did it take from the time when you were told you were going off to construction to when your slab was poured? I'm not sure when "Day 1" is supposed to start heh. I'll hopefully be updating my blog more frequently now that we are in the build process!


2 weeks for us still slab is poured followed by 1st progress billing. Congrats!
wingzee
Buildingourfirstnest
After signing the tender with Clarendon in Feb 2017, we have now been handed over to construction!! (delays were cos of our land registration so Clarendon's delays suited us fine).

Just wondering how long did it take from the time when you were told you were going off to construction to when your slab was poured? I'm not sure when "Day 1" is supposed to start heh. I'll hopefully be updating my blog more frequently now that we are in the build process!


2 weeks for us still slab is poured followed by 1st progress billing. Congrats!

Thanks Wingzee! Congrats on PCI can't wait to see more photos and updates from you











We now have the cabinets & garage door! Counting down to handover.
Nice! Wingzee which suburb are you in and was it a KDR?
k3nnis
Nice! Wingzee which suburb are you in and was it a KDR?


North Kellyville. It’s a new build. Been 9 months!
Cool. Very close now
wingzee
k3nnis
Nice! Wingzee which suburb are you in and was it a KDR?


North Kellyville. It’s a new build. Been 9 months!


That's similar to ours! I think we started around the same time.

We are building in Leppington and just had our bathrooms tiled and grouted. Cabinets installed but no garage door. This week they just finished a coat of paint.
wingzee can i see some more pics? and how long has your build taken to date?
Nice! Wingzee - do you remember how much your pull-out spice rack cost? Would love to add it in...
vincent2166
wingzee
k3nnis
Nice! Wingzee which suburb are you in and was it a KDR?


North Kellyville. It’s a new build. Been 9 months!


That's similar to ours! I think we started around the same time.

We are building in Leppington and just had our bathrooms tiled and grouted. Cabinets installed but no garage door. This week they just finished a coat of paint.


Is yours a Oceanside 36 too? Have you been given a handover date yet? Our bathrooms supposed to be tiled this week!
trendy1
wingzee can i see some more pics? and how long has your build taken to date?


That’s pretty much what we took! Any particular photos you’re after?
Buildingourfirstnest
Nice! Wingzee - do you remember how much your pull-out spice rack cost? Would love to add it in...


That costs us $750
wingzee
vincent2166
wingzee
Nice! Wingzee which suburb are you in and was it a KDR?


North Kellyville. It’s a new build. Been 9 months!


That's similar to ours! I think we started around the same time.

We are building in Leppington and just had our bathrooms tiled and grouted. Cabinets installed but no garage door. This week they just finished a coat of paint.


Is yours a Oceanside 36 too? Have you been given a handover date yet? Our bathrooms supposed to be tiled this week![/quote]

No, our is. Boston 34. We have been told to expect it around May and April if we're lucky. Haven't been told a date for PCI yet though
We finalized upgrades. Here is an overview if anyone is interested:

Carpet $1900
Upgraded to Gold range with underlay

Vertical blinds throughout the house $2300

Kitchen $4000
Cupboard above fridge
6 pot drawers
64L bin drawer
630mm to 970mm bench-top width
Bench-top upgrade from the standard range
Two tone kitchen cabinets

Air con $7100
Fujitsu 15kw
MyAir 5 with 6 zones
Individual temperature sensor in each zone, allows you to have different temperature in each zone

Electrical $10,600
1 power circuit
6 single power points
7 double power points
4 light circuits
8 tread lights pre-wire only
6 external light points pre-wire only
13 light points upgraded to down lights
48 downlights
1 each, 2-way and 3-way switches
2 ducted ceiling exhaust fans
6 ceiling fan pre-wire with timber noggin and fan controller
1 downlights dimmer

Smart home $2200
1 video intercom pre-wire only
1 digital antenna with wiring
5 cat5e data points
3 cat6 data points
1 TV wall mount wire conduit
1 powered 4-way TV splitter

Tiles $4700
450x450 to 600x600 porcelain tiles to main areas
30x45 to 30x60 wall tiles in 3 bathrooms
Tiled splash back including behind the range hood
SnowLeopard
We finalized upgrades. Here is an overview if anyone is interested:

Carpet $1900
Upgraded to Gold range with underlay

Vertical blinds throughout the house $2300

Air con $7100
Fujitsu 15kw
MyAir 5 with 6 zones
Individual temperature sensor in each zone, allows you to have different temperature in each zone

Electrical $10,600
1 power circuit
6 single power points
7 double power points
4 light circuits
8 tread lights pre-wire only
6 external light points pre-wire only
13 light points upgraded to down lights
48 downlights
1 each, 2-way and 3-way switches
2 ducted ceiling exhaust fans
6 ceiling fan pre-wire with timber noggin and fan controller
1 downlights dimmer

Smart home $2200
1 video intercom pre-wire only
1 digital antenna
5 cat5e data points
3 cat6 data points
1 TV wall mount wire conduit

Tiles $4700
450x450 to 600x600porcelain tiles to main areas
30x45 to 30x60 wall tiles in 3 bathrooms
tiled splash back including behind the range hood


wow.. your upgrade for the tiles is considered cheap, but the rest are expensive.


My tile upgrade cost me about 15K.
wentworth33
SnowLeopard
We finalized upgrades. Here is an overview if anyone is interested:

Carpet $1900
Upgraded to Gold range with underlay

Vertical blinds throughout the house $2300

Air con $7100
Fujitsu 15kw
MyAir 5 with 6 zones
Individual temperature sensor in each zone, allows you to have different temperature in each zone

Electrical $10,600
1 power circuit
6 single power points
7 double power points
4 light circuits
8 tread lights pre-wire only
6 external light points pre-wire only
13 light points upgraded to down lights
48 downlights
1 each, 2-way and 3-way switches
2 ducted ceiling exhaust fans
6 ceiling fan pre-wire with timber noggin and fan controller
1 downlights dimmer

Smart home $2200
1 video intercom pre-wire only
1 digital antenna
5 cat5e data points
3 cat6 data points
1 TV wall mount wire conduit

Tiles $4700
450x450 to 600x600porcelain tiles to main areas
30x45 to 30x60 wall tiles in 3 bathrooms
tiled splash back including behind the range hood


wow.. your upgrade for the tiles is considered cheap, but the rest are expensive.


My tile upgrade cost me about 15K.

You must have chosen rectified tiles, they're expensive. We just chose cheapest 600x600


The rest does seem expensive but I had external quotes that we gave to our lender. Looking at these, we got more stuff than we would've got if done after handover so just decided to do it with them and have everything ready when we move in.
Related
1/10/2023
1
Clarendon Boston or Saratoga

General Discussion

the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this.

22/12/2023
4
Clarendon Eaves and Guttering Issue

General Discussion

The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's…

You are here
Building ForumBuilding A New House
Home
Pros
Forum