Browse Forums Building A New House Re: Who's building with Clarendon?? 8162Jun 04, 2015 10:52 am From what I've been told by my SS, a standard 2-storey is around 3 to 4 weeks once the frames are done.. but that's only what he said.. and I'm not sure if that allows for weather delays or trades shortages etc Paddington 29 @ Blue Horizon Estate (Lot 105, Wattleridge Crescent, North Kellyville) Our Build Progress Blog: http://light487.wordpress.com/ Re: Who's building with Clarendon?? 8164Jun 04, 2015 12:29 pm light487 From what I've been told by my SS, a standard 2-storey is around 3 to 4 weeks once the frames are done.. but that's only what he said.. and I'm not sure if that allows for weather delays or trades shortages etc Thanks Light, fingers crossed. I'm looking forward to not having to worry about weather delays. Building a Parkhill with multiple variations in QLD http://thathousetherurisbuilt.blogspot.com.au/ -Blog updated regularly Re: Who's building with Clarendon?? 8169Jun 04, 2015 1:11 pm 4 kids under 9, 1 mad dog and a cat.... do we go tiles or floorboards (engineered flooring)? To the entrance, main living, kitchen and dining. Re: Who's building with Clarendon?? 8170Jun 04, 2015 1:32 pm In that situation, I'd be choosing tiles... the hardest engineered surface is bamboo and even that scratches and soaks up moisture etc.. If it were me, I just know I'd be a lot less stressful with tiles than worrying about the floorboards all the time.. Paddington 29 @ Blue Horizon Estate (Lot 105, Wattleridge Crescent, North Kellyville) Our Build Progress Blog: http://light487.wordpress.com/ Re: Who's building with Clarendon?? 8171Jun 04, 2015 1:46 pm rmjose18 Got our notice for practical completion today! We r almost there!!!! Building Sheridan 34 (38 after upgrades) @ Kellyville, NSW Check out our Clarendon Building Progress Blog Homeone Topic: Clarendon Casadream Build Re: Who's building with Clarendon?? 8172Jun 04, 2015 2:24 pm Congratulations on everyone's progress! I do hope for the ones waiting for bricks, movement should be coming your way! Rose, when is your PCI date? I bet you can't wait! Denot - Congrats for PCI too! Kim - I've got 3 x young kids & we are doing tiles downstairs (carpets for HT, study & living room). We would have wanted floorboards but just thought of the practicality. Fingers crossed that our target PCI date of the 24th June stays on that date! Re: Who's building with Clarendon?? 8174Jun 04, 2015 2:40 pm rmjose18 PCI is 15 June .. And handover of 26 or 29 June Woohoo we will be moving house at similar time then rose! Our SS was hoping if nothing major on PCI, he will hand the key the Friday after. Re: Who's building with Clarendon?? 8175Jun 04, 2015 2:41 pm Heidimikew Latest update, 6 days till handover and the cleaners are in. Looks like a lot of touch ups need to be done in that time but I'm not stressing anymore! Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ The lot has been cleared but still need to fix the wrong colour capping on the pillars (should be monument not surfmist) and paint a downpipe. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ The expesive 3 phase power board Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Looking from the front door in Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Looking from back to front door Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Study Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Powder room Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Powder room Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ WIL Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Theatre room Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Family room Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Looking down to the family room Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Kitchen Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Laundry and pantry Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Love my pendants Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Rumpus Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Kids room Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Main bathroom Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Master with WIR Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Ensuite Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ myair Its feeling almost complete! 😆 Heidimikew do you mind me asking what your tiles are on the floor in the bathroom?? Re: Who's building with Clarendon?? 8176Jun 04, 2015 2:53 pm EmmaJamie.. I think Heidimikew has been MIA lately...busy moving in I can tell you though that her tiles are 450mmx450mm Belga Taupe from Beaumont Tiles. Re: Who's building with Clarendon?? 8177Jun 04, 2015 2:56 pm Congrats everyone how exciting!! Here I am still in council! Anyone wanting to go blinds after handover this is a great temporary product ezyblinds.com.au. They go on with double sided tape! They can be cut! I'll definitely be getting these for after handover! Building the Clarendon Merriden 30 (44 after Mods) @ Harrington Grove! Re: Who's building with Clarendon?? 8178Jun 04, 2015 2:57 pm Congrats everyone how exciting!! Here I am still in council! Anyone wanting to go blinds after handover this is a great temporary product ezyblinds.com.au. They go on with double sided tape! They can be cut! I'll definitely be getting these for after handover! Building the Clarendon Merriden 30 (44 after Mods) @ Harrington Grove! the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 6690 The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's… 4 7822 Thanks for your reply. I will just wait and see I guess. Trying to get some more information from our builder. 9 30236 |