Browse Forums Building A New House Re: Who's building with Clarendon?? 17688Aug 25, 2017 2:42 pm Building a modified Madison 39 with Clarendon Homes in Tennyson homeone link: viewtopic.php?f=31&t=79106 Blog Link: https://minandb.wordpress.com/ Re: Who's building with Clarendon?? 17692Aug 26, 2017 5:38 pm Building Wentworth 33 CDC lodged to Council : 22 June 2018 Site excavation 31 July 2018 Slab 08 Aug 2018 Frame 22 Aug 2018 Roof 10 Sep 2018 Brick 24 Sep 2018 Re: Who's building with Clarendon?? 17697Aug 28, 2017 12:02 pm Timber noggins for downstairs is something u must do during your appointment. And yes for external just junction boxes. GPOs he drill and patch on to the closest existing GPO. Ex, I put two extra in my kitchen and one in garage then another external one. As long as they are on the same wall it's easy Visit my blog Clarendon Bronte 25 Re: Who's building with Clarendon?? 17698Aug 28, 2017 2:46 pm Gambit79 Mrs RS RBuild Hi All, Does anyone know how long Clarendon (builders) shut down for over the Christmas/New Year Period? The last time we built was not over the end of year period, Our CSC has stated the shutdown period for this year has not been confirmed as of yet. However most trades are not back until Feb? is this correct? if so this has the potential for site progression to be delayed 2 months? Located in QLD, Any light someone could shed on this would be great, Thankyou! I am not 100% but it's 3 weeks. .. With Clarendon the answer is 'as long as they want'. They don't give a damn about timeframe so expect a Christmas delay to result in slow progression for bout 3 months. Then they'll do a flurry of work for a month then nothing. Contract dates mean nothing and the trades don't care because there is too much work on for them. Argh...Hoping its not 3 months. Re: Who's building with Clarendon?? 17699Aug 28, 2017 2:47 pm Mrs RS RBuild Hi All, Does anyone know how long Clarendon (builders) shut down for over the Christmas/New Year Period? The last time we built was not over the end of year period, Our CSC has stated the shutdown period for this year has not been confirmed as of yet. However most trades are not back until Feb? is this correct? if so this has the potential for site progression to be delayed 2 months? Located in QLD, Any light someone could shed on this would be great, Thankyou! I am not 100% but it's 3 weeks. .. Thankyou Re: Who's building with Clarendon?? 17700Aug 28, 2017 9:13 pm Congrats ajedi2k for finally able to move in! House looks fantastic! Just been to our site again last weekend (we try to drop by once a month) & build is progressing well (construction started since June) albeit we do see notice some workmanship issues with the bricks layering (from internal, external looks fine) - job looks sloppy to me. Before I starts to question the SS (whom been great), can anyone confirm if this is normal & will be "cleaned up" later on? I checked with some of my mates & they confirmed that it's absolutely normal & will be patched up nicely before insulation & gyprock. Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ Building a Oceanside 36 @ Kellyville the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 3132 The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's… 4 3906 I’m curious about how you went with this. We are planning a KDRB and considering Plantation Homes as a builder. I’m aware that after the demolition another soil test… 1 6315 |