Browse Forums Building A New House Re: Who's building with Clarendon?? 9112Jul 03, 2015 7:45 pm Paddington 29 @ Blue Horizon Estate (Lot 105, Wattleridge Crescent, North Kellyville) Our Build Progress Blog: http://light487.wordpress.com/ Re: Who's building with Clarendon?? 9113Jul 03, 2015 8:51 pm Hi Everyone, Well im getting close now, Kitchen and bathroom vanities are in, tiling to wet areas done and skirting went on today, Im told by my SS paint is going on next week. Given i am doing all of my own flooring after handover and based of your own experience, how long have i likely to have left I see electrical fitout, water and gas fittings, bath tub, sinks, showers etc, some external painting and thats all i can see as being left SS reckons first week of aug for handover Re: Who's building with Clarendon?? 9114Jul 03, 2015 8:57 pm @ light487. They built my lounge of a picture only. Only thing I told them was the dimensions, what colour I wanted the cusions and what material I wanted it built in. It came pretty close to the picture. Re: Who's building with Clarendon?? 9115Jul 03, 2015 9:23 pm buzurk Hi Everyone, Well im getting close now, Kitchen and bathroom vanities are in, tiling to wet areas done and skirting went on today, Im told by my SS paint is going on next week. Given i am doing all of my own flooring after handover and based of your own experience, how long have i likely to have left I see electrical fitout, water and gas fittings, bath tub, sinks, showers etc, some external painting and thats all i can see as being left SS reckons first week of aug for handover How exciting buzurk!! Do you have any pics? Building the Clarendon Merriden 30 (44 after Mods) @ Harrington Grove! Re: Who's building with Clarendon?? 9116Jul 03, 2015 11:09 pm buzurk Hi Everyone, Well im getting close now, Kitchen and bathroom vanities are in, tiling to wet areas done and skirting went on today, Im told by my SS paint is going on next week. Given i am doing all of my own flooring after handover and based of your own experience, how long have i likely to have left I see electrical fitout, water and gas fittings, bath tub, sinks, showers etc, some external painting and thats all i can see as being left SS reckons first week of aug for handover Looks like we are both at the exact same stage. We're having a walk-through in 2 weeks and then handover is 2 weeks after that, so first week of August for us too. $395 Fixed Priced Landscape Plans for DA M: 0435 127 244 | W: bluegumdesign.com.au | E: info@bluegumdesign.com.au Residential | Commercial | Industrial Re: Who's building with Clarendon?? 9120Jul 04, 2015 7:52 am Thanks so much for sharing those pics Rose. What a lot of storage!! Looks brilliant! We are getting their estimate quote on Monday. Found the guy there extremely helpful. We are also looking at getting an inbuilt home theatre cabinet from them also. Was your SS ok with allowing them in to do a check measure? Building the Fairmont 38 with upgrades @ Castle Hill NSW the stair balustrades? There is nothing special about these and I imagine literally every stair installer will be able to do this. 1 6731 The two 15mm holes are obviously not compliant. The Dept of Fair Trading would love to see this one! Do the gutters pool water after it stops raining? Although it's… 4 7847 |