Browse Forums Building A New House Re: Building Simonds Amberlea - PCI & Settlement 261Apr 26, 2012 5:33 pm hubby, kids and me all waiting for the Amberlea Site Cut 27 September 2011 https://forum.homeone.com.au/viewtopic.php?f=31&t=46637 http://www.dscml.com/ Re: Building Simonds Amberlea - PCI & Settlement 263Apr 27, 2012 9:00 pm hubby, kids and me all waiting for the Amberlea Site Cut 27 September 2011 https://forum.homeone.com.au/viewtopic.php?f=31&t=46637 http://www.dscml.com/ Re: Building Simonds Amberlea - Flyers 265Apr 28, 2012 4:55 pm I think it would be normal to build a house and receive a few flyers during the build for businesses who would like to promote themselves. We have only whited out the phone numbers but this is what we received today Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅ I will be taking it to work on Monday for someone to translate it to me. hubby, kids and me all waiting for the Amberlea Site Cut 27 September 2011 https://forum.homeone.com.au/viewtopic.php?f=31&t=46637 http://www.dscml.com/ Re: Building Simonds Amberlea - Flyers 266Apr 30, 2012 7:31 am Lol ![]() Somehow I don't think you're their target market... Re: Building Simonds Amberlea - Flyers 268Apr 30, 2012 8:49 am edscl & Bron - need some advice: The motar on our brick in some places are a different colour, apparantley this is because some motar was machined mixed and others when fixing up bricks were done via hand mix. Our ss said we could still go to settlement but have a letter of undertaking to say they still need to fix the motar. He is saying that they wait to see if the colour will change due to drying and if not they need to get someone to "bleech to colour". Do you think I should still go to settlement?? any input will be great, thanks Re: Building Simonds Amberlea - Flyers 269Apr 30, 2012 11:02 am I can try to translate that for you --- Saw a few of them in the home show over the weekend. It is a coating they apply on your window to block heat, scratch etc... It is supposed to achieve the same protection as double-glazing your windows. (FYI - I do not read Chinese) it is around $80 to $120 per square meter Orchid 4200 with Burbank: Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=53034 House Built in 7 Months and 2 weeks Re: Building Simonds Amberlea - Flyers 270Apr 30, 2012 12:00 pm @Kranzy Personally I'd wait until it was sorted out one way or the other before going to settlement. Surely the mortar should be well and truly dried before getting close to settlement? If they have to fix it, better that they have the incentive of the final payment to encourage them to sort it out quickly! In my opinion, the maintenance period is for just that - MAINTENANCE - not finishing the job that should have been done in the first place. Re: Building Simonds Amberlea - Flyers 271Apr 30, 2012 12:03 pm ![]() @Kranzy Personally I'd wait until it was sorted out one way or the other before going to settlement. Surely the mortar should be well and truly dried before getting close to settlement? If they have to fix it, better that they have the incentive of the final payment to encourage them to sort it out quickly! In my opinion, the maintenance period is for just that - MAINTENANCE - not finishing the job that should have been done in the first place. ![]() ![]() For info on our build: viewtopic.php?f=31&t=43093 Built the McLaren by Dechellis - slab down 22 Feb - handover 30 Aug 2011 - and gardens finished 9 Dec 2012!! Re: Building Simonds Amberlea - Flyers 272May 04, 2012 7:09 am ... settlement day? Don't leave me in suspense Edscl! (It's funny, somehow the sooner you get in, the closer I feel ![]() Re: Building Simonds Amberlea - Flyers 273May 04, 2012 9:39 am Was thinking today if you got your keys or not Keep us posted with PICS ![]() Orchid 4200 with Burbank: Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=53034 House Built in 7 Months and 2 weeks Re: Building Simonds Amberlea - Settlement Looming 274May 05, 2012 9:36 pm hi de ho, everyone, Kranzy, our telstra pit was put in the same time as the metre box, there is orange conduit sticking out of the ground just waiting for telstra to come along and put it in, this was the builder's idea and it has actually saved us money with telstra, and they did it off their own back, which was good for us as we didn't even think about it. Also we are getting cable internet, my husband is very excited about this. I will be happy if it just works. that flyer was about window glazing, mmm, we have been thinking about retro fitting double glazing or replacing the front windows altogether, interesting, why couldn't it just be in english. Ok, we received our inspection report from New Homes Inspections. There are no huge issues with the house. Some mortar was missing (acid wash) and mortar cracking (acid wash), and a wall in the kitchen was a bit out, and we were missing the drains as per the plans in the front and rear of the house, and heaps of windows scratched on the inside. The last thing was our missing filter tap for the upstair powder room. Well the report came in 3 days after we were told we were to receive it, so that delayed things. The mortar is the main issue I have, I am not fussed about the internal wall in the kitchen being out, but ideally would like it resolved. The mortar was damamged during the acid wash, our site supervisor sometimes thinks it is true and sometimes thinks it is the mix of mortar, either way we have some cracks in the mortar which we would like to be re-pointed. We would just be happy if the repointing happened around the front entrance, which is not a huge area, but we would also like the gaps filled in. Should mention that the mortar cracks are not huge. My husband is not fussed to be honest, both myself and the inspector have picked this up, but the inspector could explain why it happens much better than me. Half of the windows have already been replaced, and the drains are installed now, but in the worst places possible. So it really comes down to paint touch ups still to be done, but the rain has probably delayed it. Cleaning, other half of windows to be replaced, mortar repairs and if possible a straightening of a wall. We are not able to tell if they have levelled out the kitchen slab, or poured a concrete slurry in the garage to fill in the gaps between the slab and the outer bricks. Our site super thinks we could settle this Thursday 10th May, It is quite possible if they pull their fingers out of their buts. But I think we should arrange New Homes Inspections to come out to see if they fixed things from their report. We have to be out of this house by the 17th May, so we really need Simonds to get a move on. And tomorrow I will in ernest start to pack, which seems fruitless and I am only moving 75 metres away. hubby, kids and me all waiting for the Amberlea Site Cut 27 September 2011 https://forum.homeone.com.au/viewtopic.php?f=31&t=46637 http://www.dscml.com/ Re: Building Simonds Amberlea - Settlement Looming 275May 06, 2012 7:54 pm Good to hear Simonds have agreed to fix all the issues. This weather is shocking isn't it? Hopefully the tradies, specially the painters are not held up from previous week's job. All best for a handover this Thursday ![]() Orchid 4200 with Burbank: Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=53034 House Built in 7 Months and 2 weeks Re: Building Simonds Amberlea - Settlement Looming 276May 06, 2012 8:41 pm Thanks Doublej, I sometimes don't know what to think about the house, but we only have 10 days to get out of here so they need to get a move on. I don't know how many other knock downs and rebuilds find that their place is a dumping ground for all sorts of strange things, or maybe this is building in general. We have had a diesel can with diesel in it left in our cage then spilled everywhere, don't even know where to dispose of the left over diesel, and now a mountain bike on our property, we did have the usual christmas tree suspect in January as well. At the moment accross the road are 2 car tyres, if they come over I am taking them back hubby, kids and me all waiting for the Amberlea Site Cut 27 September 2011 https://forum.homeone.com.au/viewtopic.php?f=31&t=46637 http://www.dscml.com/ Re: Building Simonds Amberlea - Settlement Looming 277May 07, 2012 3:31 pm The last stage is a real grind isn't it? I hope they get going for you, the weather is supposed to be pretty clear this week. As far as I'm aware, we haven't had any dumping on our site, but maybe it's a location thing? Although a mountain bike isn't what you'd normally expect to be dumped - was it any good? ![]() Re: Building Simonds Amberlea - Settlement Looming 278May 07, 2012 4:36 pm thanks Bronj, it is totally dragging on, the mountain bike and the tyres disappeared after work today, the bike was ride-able, maybe someone thought they could fix it up. But so over it, I want to see action on the house hubby, kids and me all waiting for the Amberlea Site Cut 27 September 2011 https://forum.homeone.com.au/viewtopic.php?f=31&t=46637 http://www.dscml.com/ Re: Building Simonds Amberlea - Settlement Looming 279May 09, 2012 9:57 pm Keys tomorrow ? ![]() Orchid 4200 with Burbank: Thread: https://forum.homeone.com.au/viewtopic.php?f=31&t=53034 House Built in 7 Months and 2 weeks Re: Building Simonds Amberlea - Settlement Looming 280May 10, 2012 6:04 pm I had a site meeting this morning before work and school, hence we were late for school and work. Short answer - nope, now Tuesday. It is a matter of the painters not painting and finishing properly, and the mortar not finished properly, so the site supervisor has resorted to doing it himself, and the window people not replacing 1 window and not changing all of the rusty screws in the sliding windows - there is a tip, check for rusty screws and nails, and also the drain people only aligning half the down pipes, a thin layer of concrete to go over the porch slab and the garage slab, the garage door needs to be replaced as some lovely tradie dented the lower panel, then I can move in. ARGGGHHHHH. Our site supervisor also has resorted to filling in the divots in the slab himself. When I am thinking about it I get all frustrated, but when I am at the house I seem to see that these jobs wont take long, but the frustrating part of it is that the site supervisor believed these above jobs were done and they weren't and he has signed off on their payments. But the painter has so much cheek, I even asked him if he will be there all day, which he said yes, and then he disappeared. The painting guy was suppose to finish today and alas he disappeared straight after the site super left at 9am. We have to be out of this rental house on Monday 21st May, and the real estate agent contacted my husband last night to see if we were out yet ![]() hubby, kids and me all waiting for the Amberlea Site Cut 27 September 2011 https://forum.homeone.com.au/viewtopic.php?f=31&t=46637 http://www.dscml.com/ 4 5183 Hi AKG, We had a base tender of $592 for 31 squares from MC Donald Jones. It looks relatively cheaper than other builders. But I assume there are many hidden things that… 1 18406 To help others plan their flame zone build, in the coming days I will do a reconciliation of the major category of costs. I just have to finalise some of the client… 112 382007 ![]() |