What is the proticol on this? Do you ask SS first or do you speak to the tradies and have them do it without consulting SS.
I just wonder if you get something extra done then obviously its going to be seen by SS but if you ask him will it be done 'officially'. We have a long hall outside beds and bath and we had left this to be carpeted by us after handover but having spoken to carpet place this hallway effects other things so he suggested tiling it. On thinking about it, it would be good as its outside the bathroom and saves it getting wet etc. SO we rang our tile shop and ordered more main floor tiles. So now do I ask main floor tiler if he would tile it or do I wait until after hand over?
Thanks for your help