Browse Forums Building A New House Re: Is hand over the end-all be-all?? 2Jul 20, 2010 1:18 pm contract signed: Nov 09 Released to Construction: 23 Jul 10 Slab poured: 9 Aug 10 Frame completed: 30 Aug 10 Windows & Gutters: 7 Sep 10 Bricks: 15 - 23 Sep 10 Roof: 24 Sep 10 Gyprock: 20 Oct 10 Lockup: 25 Oct 10 Kitchen: 27 Oct 10 Tiling: 6 - 9 Nov 10 Painting: 17 Nov 10 Carpet: 30 Nov 10 PCI: 15 Dec 10 Handover: 17 Dec 10 https://forum.homeone.com.au/viewtopic.php?f=31&t=35943 Re: Is hand over the end-all be-all?? 5Jul 20, 2010 1:22 pm contract signed: Nov 09 Released to Construction: 23 Jul 10 Slab poured: 9 Aug 10 Frame completed: 30 Aug 10 Windows & Gutters: 7 Sep 10 Bricks: 15 - 23 Sep 10 Roof: 24 Sep 10 Gyprock: 20 Oct 10 Lockup: 25 Oct 10 Kitchen: 27 Oct 10 Tiling: 6 - 9 Nov 10 Painting: 17 Nov 10 Carpet: 30 Nov 10 PCI: 15 Dec 10 Handover: 17 Dec 10 https://forum.homeone.com.au/viewtopic.php?f=31&t=35943 Re: Is hand over the end-all be-all?? 6Jul 20, 2010 1:26 pm Aaron & Erin We made our final payment on handover day on June 30th. We've had quite a few little issues (some big) since then. Our handover guy drops in whenever we ask him to. We're not happy with a few more things, which their organising maintenance guys to come back. Handover isn't the be-all-and-end-all (or whatever the saying is). We've had more to do with our builder since getting the keys Thanks for that - I've been watching the build so far, and nothing strikes me as particularly wrong. I'd be more than happy to pay the builder on the day and have them come back from time to time to fix any little issues. I just want to get into my house!!!! P. If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 4490 Minimum overhang into gutter must be 50mm, turn down tool should not split the sheet. it seems wrong tool for the profile was used, the flashing cannot slope back. Rib… 2 2133 Electrical just got back to me and said the most they can provide is a single power point on the Bedroom 1 side of that wall. After handover, your towel rail installer… 2 3852 |