Hi all,
Some of you will have followed previous posts of mine that tell you what a total disaster our entire build has been since day one.
We are now 3mths after PCI and still having things fixed from that inspection.
We have also encountered some major dramas in the first couple of months living here.
- Our kitchen sink pipes leaked and our dishwasher leaked. This destroyed all of the kitchen cabinetry and that has has to be replaced. It was finally replaced yesterday, and go figure nothing ever goes back the same way so now we have 1-2mm gaps in all the joins which look awful.
We also need the kitchen retitled as the tiles were broken replacing the cabinetry.
- Our concreter were here today to concrete the side of our house and driveway.
They levelled all the land and went to put their drains in and found that 2 of our downpipes were not connected to the storm water. They had been connected but the connection pipes have been so destroyed at some stage they weren't connected any more.
We have had constant tradesmen and disruptions to our family life since the day we moved in. We have now lived here 10weeks and the work is still going (we haven't even had our 3mth maintenance).
That is not to even mention the fact we have a 3mth old baby who I cant breastfeed and a 3yr old who I cant look after due to interruptions and work happening.
We are looking at taking legal action for compensation. I am also considering Today Tonight and A Current Affair.
Can anyone advise me on the course of action and what I should do.
I have no idea at the moment who to even contact about all of this and start proceedings.
Thanks so much everyone!