Browse Forums Building A New House Re: Our Foxley 29 is due to be finished end of May 2May 03, 2010 4:18 pm Hi guys After running around for a while I have decided to build Foxley 26 with Porter Davis. I have made a bit of modification to it and have removed the wall between the Lounge room. Therefore, now I have a bigger Family area. http://porterdavis.com.au/content/House ... xley26.pdf I like the plan now but I am confused on how to get a good outdoor area coz I cannot extend the patio since my block is only 16 m wide. I do have 7.5 meters in the backyard. Any suggessions ?? Thanks Manu Re: Our Foxley 29 is due to be finished end of May 3May 05, 2010 10:18 am Make sure they book in for your appliances/HWS/heating to be installed at PCI, not at handover - there is a 5 business day lead time on organising the tradies - which meant we had a week with no appliances, heating or hot water... I engaged my builder in December last year and we’ve been working on preliminary drawings for last couple of months. I got a call from the salesperson this morning… 0 604 Minimum overhang into gutter must be 50mm, turn down tool should not split the sheet. it seems wrong tool for the profile was used, the flashing cannot slope back. Rib… 2 2138 Electrical just got back to me and said the most they can provide is a single power point on the Bedroom 1 side of that wall. After handover, your towel rail installer… 2 3895 |