Our builder has just finished laying the waffle pod slab to our new home and I think I have noticed a problem. The toilet pipes coming through the slab had a cover on them and have finished flush with the slab except for one toilet where the pipe is now missing. The pipe was there before the slab was poured and I think that it is now buried under all the concrete. I did question the pipe as it was only just coming out of the ground by a few inches. Does anyone know what they would do to fix this. I would imagine that the concrete has now spilled down into the sewer system under the slab.
Thanks, Mark.