Browse Forums Building A New House Re: Metric@n Jasper 37 (Vic) 22Jul 26, 2010 9:35 pm The Metric@n QA guy was on site today, hopefully nothing much wrong. I am sure he would of picked up the substandard work on the render, the average stain job on the timber windows / rear doors and some piping issues. Good to see a sub contractor from Telstra checking the phone box install. Gas meter has been in place for a week or so. Once we have the inspection I'll post some pictures up. Metric@n Jasper 37 changed to Jasper 39 http://newhomejasper.blogspot.com/ 05/2/10 Started site cut 26/3/10 Site cut, retaining wall, slab, frames, roof and wrapping completed 31/3/10 Bricks started I have posted this before: We hired Darbecca to do every stage inspection, and I strongly recommend them to anyone that asks me. They were amazing. Thorough reports… 2 4494 |