Browse Forums Building A New House Re: Extension for FHOG 4Sep 17, 2010 3:26 pm generally OSR is sympethatic towards you if the delay was genuine and beyond your control. make sure you filled up the form correctly (they updated with new form may 2010) and get in touch with your agent (if you are using one and that will be the bank generally) we were 3-4 months behind but was approved for the extension and received all our money as well. is not an issue at all. hope this helps Hi, We have a single story MacDonald Jones house, on a waffle pod slab with steel frame. Are we able to build a second story extension? Other info is we are 900mm from… 0 8463 Hello Josh, This is Irving from PRIMA, we are a manufacturer of the staircase, railings, kitchen cabinets, windows, doors from China. If you have requirement to purchase… 0 5456 I would say both styles you have pictured are steel. The lower chord of the first pic would be a massive lump if made using timber considering the size of the rafters. If… 1 6151 |