We are going to build North of Newcastle on a 2000sqm block with a 12 metre set back. Have had a local volume builder which we really like do a quote.
This is what they have listed as site costs.
Fixed Price Site Costs
* Site preparation for concrete slab $ 980.00
* External Sewage drainage connection $2,950.00
* Connect water service $ 660.00
* Provide under ground electricity $ 920.00
* Upgrade single phase to 3 phase(for airc) $450.00
* Provide concrete pump for slab $590.00
* Provide drilling rig for piers $610.00
Sub Total $8,660.00
Special Council, Government Body and/or developer requirments
* Provide concrete slab designed for H site
classification $3590.00
*Temporary security fencing $2050.00
* Provide roof rail scaffold $1200.00
*Electric metering"site establishment fee" $170.00
*Basix- 10,000Litre poly tank on concrete
slab.Recycled water to toilets,washing machine
& one external tap. No allowance for tunnel or
rubble trench for overflow. $8,210.00
*Connect tank to overflow from water tank
to rear interallotment drainage $ 890.00
*Stormwater- provide 11 lineal metres of
standard tunnel trenching with debris pit $1,690.00
*Quantum heat pump HWS $1,080.00
Sub total $18,880.00
TOTAL $27,540.00
Any help would be much appreciated.
Thank you all for the great info so far.