Browse Forums Building A New House 1 Feb 20, 2010 11:00 pm Hi there we are now at practical completion but are wondering about what happens with the path/kerb deposit? We paid this to the builder as part of our costings but are wondering 1) who repairs the path/kerb? -ie builder or us 2) do we get the deposit back if the builder repairs it? 3) if the builder keeps the deposit if they repair it, is it cheaper to repair ourselves? cheers about to build our first home! Re: kerb/path deposit 2Feb 21, 2010 6:10 am The local council will have this deposit, once there happy with works they will release. Depending on your agreement with the builder will determine who fixes. Its normally all done with driveway install. Landscape Design & Construction http://cherub.squarespace.com/ Hello everyone, After some suggestions and ideas about how to put a concrete path around the drop edge beam area on our new build. We are required to have a concrete path… 0 12867 Thank you so much for your response. I have drawn a pedestrian gate in - for curb appeal, let's see how much costs come in at. I think you're right - if we decide to… 2 6517 Hi all Following the recent heavy rainfall in Sydney, I am keen on redirecting water away from the house's base as much as… 0 6757 |