Browse Forums Building A New House 1 Dec 12, 2009 1:15 pm hi. when do you usuall contact your third-paty building inspector? is it before the build starts or during building (just before each stage finishes)? thanks. Oxford 22 @ Stage12a Point Cook Site Cut : 05/03/2010 Slab Pour : 24/03/2010 Frame Inspected : 06/04/2010 Pre-plaster Inspection: 22/04/2010 PCI: 16/07/2010 Final Inspection: 30/07/2010 Landscaping: who knows??? MyHomeoneThread Our Oxford22 Blog Re: building inspection 2Dec 12, 2009 2:32 pm I think some builders have inspections at each stage and some have one inspection at the end. Current build Porter Davis Brookwater 49, Eucalypt Wollert Build: 24th Jul 2015 - Approx Mar 2016 Previous build DFH Columbia 21, Lyndarum Epping North Build:20th Jul 2009 - 18th Dec 2009 Re: building inspection 3Dec 12, 2009 4:53 pm I usually give about 3 or 4 days notice. Seems to work out fine. Trying this building gig one more time. you need to understand the breakdown of warranties. 90 warranty is considered as minor defects rectification period where as the longer ones are more major/structural… 1 5351 i would suggest nothing is unreasonable for PCI. we did all sorts, including checking the hot water, checking all the GPO's had power, testing that the showers were… 9 98695 Hi, I have this sewer inspection point sitting in an odd spot in the rear of my yard: https://imgur.com/ghLI98q What I'd like to do is put a firepit in that corner of… 0 6533 |