Hi
Our site works is about to start and I've received a letter from the assigned Electrician asking if we would like Underground Conduit with draw wires pretty well after the slab is laid (and at the same time as consumer mains)
Cost (in Adelaide) is $250 ex GST for a max of 15m
Is this reasonable?
Is there anything else I should be considering at this stage of proceedings?
Thanks