Browse Forums Building A New House 1 Nov 30, 2009 8:04 pm The tradies all have a copy of the master key and when handover happens the key that the builder gives you is different, so when you put your keys in it somehow knocks a pin out in the barrel which will cancel out the the builders keys. Re: House at Lockup - is the Key kept on Site ? 2Nov 30, 2009 8:34 pm for my place there was always a door or window unlocked. this was until about 2 weeks ago just before our PCI. i didnt like the fact it was left open to anyone-lucky there was no damage besides a bath tub spout going missing - atleast i was able to check on the progress. Re: House at Lockup - is the Key kept on Site ? 3Nov 30, 2009 8:42 pm I built with a large volume builder and the tradies had a master key (see issy jo's post above!), but my Parents built with a small local custom builder (who is actually a friend) and their key was left onsite! Henley - Wilshire Mk 3 ... I love my house!! Site start: 4th Feb 09 Handover: 10th Sep 09 Blog: http://stormygirlscastle.blogspot.com/ Build Thread: viewtopic.php?t=7166 Re: House at Lockup - is the Key kept on Site ? 4Nov 30, 2009 8:46 pm Mel_24_ for my place there was always a door or window unlocked. this was until about 2 weeks ago just before our PCI. i didnt like the fact it was left open to anyone-lucky there was no damage besides a bath tub spout going missing - atleast i was able to check on the progress. My bath spout went missing to, I wonder where they go? Your house should come in "as new" condition. It should be clean, and without stains 1 4555 Hi All It has been a few weeks since my last update. The build has been progressing well. No major issues to report. The scaffolding was dropped today, gyprock will be… 96 357032 I am not sure whether Perth has its own way of doing things in regards to this. Most of Perth has class A (sandy soil), except for some areas near rivers or hills. 2 13103 |