Have been watching a a re development up the road today where they used a massive concrete pump to lay the slab. They were on the non powerline side of the road hence easy access. If we knock down and re build we are on the power line side of the road.
Does any one have an idea how the pump gets access as it is higher than the power lines and at what cost????????????????????