Browse Forums Building A New House Re: The CARLISLE HOMES & SPECTRA General Information Thread 4204Oct 03, 2013 8:07 am Carlisle Homes ~ Winslow 33 http://jm-winslow33.blogspot.com.au/ 04/7 - Site cut 22/8 - Base 28/8 - Frame 02/9 - Roof 15/9 Plumbing & Electrical 7/10 - Lockup November - Complete Re: The CARLISLE HOMES & SPECTRA General Information Thread 4212Oct 06, 2013 2:16 pm Il be happy to look over plans for lighting as long there are room dimensions. Just state whether there halogens or LEDs or batten holders and the rough amount of lumens you require per room etc.
L&O technologies use telbix brand which is a well known brand and high on there quality. As LEDs are still a technolgy for improvement, the average 8w led produces equivalent to a 30w halogen at a 55degree beam angle, where as a standard 50w halogen is a 60degree beam angle. The closest and equivalent lighting to a halogen is a approx a 15w led however as the wattage is higher so are the heat specs and this causes a lower life expectancy of the led, hence why telbix are yet to produce these and only the 8w is available as telbix want to be known as a reliable product. LEDs produce approx a 85% cri color spectrum which is much greater then the halogen which is approx 60%. Hence the LEDs will produce a much accurate light color. The advantage with the telbix brand that L&O uses is that there adaptable, using a gu10 fitting means if the lamp ever needs replacing a electrician isnt require and can be DIY. Another advantage with the telbix range is they don't use a driver, as the lamp uses 230v. So In otherwords a user can easily replace the lamp with any other gu10 led or halogen. The telbix recommend a 8w max led but I believe this can be much higher as LEDs don't produce anywhere near the heat that halogens produced and if you email telbix for there permission to put 15w LEDs (obviously another brand as telbix don't make 15w LEDs) then you will be backed by warranty as you have permission from the source. I understand carlisle homes charges a price for these LEDs but take into consideration that this also protects the customer from malfunctions and any damages by the Carlisle warranty. L&O technologies have used a number of led brands and have found the telbix range to be the most reliable with hardly any recalls or malfunctions compared to other brands. At the end of the day it's up to the customer whether they think that price is viable and worth the expense for a reliable product. My advise to u is that don't expect the same amount of light from any LEDs compared to halogens if you expect to make a savings on energy costs. Hence why LEDs are still a technology that is getting improved on. Good luck with your choices and all the best with your builds. As a customer myself, u have made the right choice to choose such a quality builder and I assure you, u won't regret choosing Carlisle once the build is complete. Re: The CARLISLE HOMES & SPECTRA General Information Thread 4213Oct 06, 2013 3:30 pm Thanks in advance for looking over my lighting plans too. You've definitely given me food for thought regarding the lighting. I may be still tempted to stick with halogens but I'll see what you think. Having LEDs at mains voltage does sound like it gives the most flexibility though. Best of luck with your build too. Our site start is not until Aug next year (our choice) so I'll be looking forward to hearing/seeing your builds progress. Re: The CARLISLE HOMES & SPECTRA General Information Thread 4214Oct 06, 2013 7:04 pm Wirepower We use the telbix range led lights with 9watt led's gu10 fitting. Produces a 55degree beam angle with approx lumens of 500. Hi Wirepower, This is a very good info!! I have ask multiple people in Carlisle Homes and no one can answer this. I have a question if you don't mind, I have put combination of LED and normal batten in multiple area of my house (plan in the blog), considering the batten comes in as standard. How easy it is to convert those battens to an LED / pendant / oyster in the future? do I need a sparky to do it for me? Re: The CARLISLE HOMES & SPECTRA General Information Thread 4215Oct 06, 2013 7:08 pm Changing a batten holder to a different fitting will require a electrician as the batten holder is hard wired and most fittings are hard wired. However u can get basic fittings that are DIY and adapt to batten holders Re: The CARLISLE HOMES & SPECTRA General Information Thread 4216Oct 06, 2013 8:29 pm Sojn Jason-Vic Sojn Received our Contract docs yesterday. There are few minor errors. We are thinking of adding extra cupboards in the Laundry. Does any one know whether we can do this at the contract appointment or is it too late..... Can only speculate, but I believe it would depend if they need to do much change to the structure (most likely not for a few cupboards), if there is space and if they will actually do extra/extending. We wanted cabinetry (effectively small half height double door cupboards) added to the hallway (nice wide hallway), however we were told that Carlisle won't do extra cabinetry/cupboards, however, another person who built with Carlisle said they got extra cabinetry work done without issue. You can only ask and the contract person will let you know - they will also go cost/inquire things while you sign the mountain of pages. Small changes such as electrical were no issue and fixing errors they had made in the document from our experience. Anything they can't work out on the day will go on another list to be followed up. Let us know how you go with the request and the response you get. Thanks Jason! Will keep you updated after the contract appointment! We signed our contract & everything went off really well.Our CLE was really accommodative of all our changes. We had about 10 changes altogether. Some that we requested were sliding door in master bedroom in leu of the window, change of sink position in butlers pantry, broom cabinet to laundry, timber entertainment doors, double railing to all rooms and few electrical changes. We were able to get all changes approved! So happy with Carlisle homes!!!! Re: The CARLISLE HOMES & SPECTRA General Information Thread 4217Oct 07, 2013 9:23 am Sojn We signed our contract & everything went off really well.Our CLE was really accommodative of all our changes. We had about 10 changes altogether. Some that we requested were sliding door in master bedroom in leu of the window, change of sink position in butlers pantry, broom cabinet to laundry, timber entertainment doors, double railing to all rooms and few electrical changes. We were able to get all changes approved! So happy with Carlisle homes!!!! That's great news! Even better that you go the extra cabinet work - we must have just been unlucky. Carlisle Homes ~ Winslow 33 http://jm-winslow33.blogspot.com.au/ 04/7 - Site cut 22/8 - Base 28/8 - Frame 02/9 - Roof 15/9 Plumbing & Electrical 7/10 - Lockup November - Complete Re: The CARLISLE HOMES & SPECTRA General Information Thread 4218Oct 07, 2013 10:57 am Hi all I'm going to sign my contract today. I just wanted to know of anyone has been successful in amending or removing parts of the contract. I'm referring to Carlisle conditions and clauses. Not changing the house or adding power sockets. Will they negotiate on this or are they set in stone? Thanks Re: The CARLISLE HOMES & SPECTRA General Information Thread 4219Oct 07, 2013 11:06 am walkz187 Hi all I'm going to sign my contract today. I just wanted to know of anyone has been successful in amending or removing parts of the contract. I'm referring to Carlisle conditions and clauses. Not changing the house or adding power sockets. Will they negotiate on this or are they set in stone? Thanks Hey Walkz187, yeah i've been successful in amending and removing things from my contract. best of luck!! Re: The CARLISLE HOMES & SPECTRA General Information Thread 4220Oct 07, 2013 11:19 am Wirepower Changing a batten holder to a different fitting will require a electrician as the batten holder is hard wired and most fittings are hard wired. However u can get basic fittings that are DIY and adapt to batten holders So you're sure they GU10? I'm looking to get some smart bulbs for my house. Building CH Ascot MK2 29 Contract - 3/5/13 Site Scrape - 16/9/13 Slab - 26/9/13 Framing - 30/9/13 Roof - 10/10/13 LockUp - 19/10/13 Fixing - 1/11/13 Painting - 11/11/13 0 2182 We are at the stage on our build in Kilcoy, Queensland where we need to get our fencing installed but we cant get any contact details for our neighbours to give them… 0 2797 You should check your detail drawings, it may show downpipe within brick pier. 14 8590 |