Browse Forums Building A New House Re: The CARLISLE HOMES & SPECTRA General Information Thread 3742May 18, 2013 9:01 am Building CH Ascot MK2 29 Contract - 3/5/13 Site Scrape - 16/9/13 Slab - 26/9/13 Framing - 30/9/13 Roof - 10/10/13 LockUp - 19/10/13 Fixing - 1/11/13 Painting - 11/11/13 Re: The CARLISLE HOMES & SPECTRA General Information Thread 3743May 18, 2013 9:09 am Building the Porter Davis Dunedin 29 maybe, thinking of forfeiting deposit and going with CH or UE Re: The CARLISLE HOMES & SPECTRA General Information Thread 3744May 18, 2013 9:28 am Building the Porter Davis Dunedin 29 maybe, thinking of forfeiting deposit and going with CH or UE Re: The CARLISLE HOMES & SPECTRA General Information Thread 3745May 18, 2013 9:50 am Building the Porter Davis Dunedin 29 maybe, thinking of forfeiting deposit and going with CH or UE Re: The CARLISLE HOMES & SPECTRA General Information Thread 3746May 18, 2013 10:53 am Building CH Ascot MK2 29 Contract - 3/5/13 Site Scrape - 16/9/13 Slab - 26/9/13 Framing - 30/9/13 Roof - 10/10/13 LockUp - 19/10/13 Fixing - 1/11/13 Painting - 11/11/13 Re: The CARLISLE HOMES & SPECTRA General Information Thread 3747May 18, 2013 11:17 am Building the Porter Davis Dunedin 29 maybe, thinking of forfeiting deposit and going with CH or UE Re: The CARLISLE HOMES & SPECTRA General Information Thread 3749May 18, 2013 11:53 am Building the Porter Davis Dunedin 29 maybe, thinking of forfeiting deposit and going with CH or UE Re: The CARLISLE HOMES & SPECTRA General Information Thread 3750May 18, 2013 9:22 pm Building CH Ascot MK2 29 Contract - 3/5/13 Site Scrape - 16/9/13 Slab - 26/9/13 Framing - 30/9/13 Roof - 10/10/13 LockUp - 19/10/13 Fixing - 1/11/13 Painting - 11/11/13 Re: The CARLISLE HOMES & SPECTRA General Information Thread 3751May 18, 2013 10:07 pm Carlisle Homes ~ Winslow 33 http://jm-winslow33.blogspot.com.au/ 04/7 - Site cut 22/8 - Base 28/8 - Frame 02/9 - Roof 15/9 Plumbing & Electrical 7/10 - Lockup November - Complete Re: The CARLISLE HOMES & SPECTRA General Information Thread 3752May 18, 2013 10:40 pm Building the Porter Davis Dunedin 29 maybe, thinking of forfeiting deposit and going with CH or UE Re: The CARLISLE HOMES & SPECTRA General Information Thread 3754May 19, 2013 12:37 pm Carlisle Homes ~ Winslow 33 http://jm-winslow33.blogspot.com.au/ 04/7 - Site cut 22/8 - Base 28/8 - Frame 02/9 - Roof 15/9 Plumbing & Electrical 7/10 - Lockup November - Complete Re: The CARLISLE HOMES & SPECTRA General Information Thread 3758May 20, 2013 12:12 pm We had our final inspection and settlement on the same day. I'm pretty sure this is bff Astandard. We knew a week in adviser Building the Ascot 35 with Carlisle Homes in Pasadena Estate, Clyde VIC My build thread: viewtopic.php?f=31&t=59776 Re: The CARLISLE HOMES & SPECTRA General Information Thread 3759May 20, 2013 12:16 pm Vetra43 Our colour browising went on fine this saturday. We are trying to have a look at different bricks etc, I must admit we are really poor in visualizing how these things are going to look on a big picture. Everything looks fine on a small area. Any help? Also people who are building affinity homes, does anybody know what are the different kitchen cupboard options offered as standard? Think everyone suffers from trying to visualize it all on a large scale - not sure how to help there. What aspect of the cupboards and which ones specifically? When we got more detailed plans at the color meeting, it showed the design of the cabinetry. (Which was different to the display home - which the sales consultant made clear to us and it was a good change too). An option we elected to, which was free was to convert the microwave prevision to a normal draw. Other than that, any changes/variation will most likely incur cost. There is a standard changes sheet that you can get from Carlisle (we got ours from the display) that allows upgrades to butlers pantry and alternative shelving - all incurred a decent charge) Carlisle Homes ~ Winslow 33 http://jm-winslow33.blogspot.com.au/ 04/7 - Site cut 22/8 - Base 28/8 - Frame 02/9 - Roof 15/9 Plumbing & Electrical 7/10 - Lockup November - Complete Re: The CARLISLE HOMES & SPECTRA General Information Thread 3760May 20, 2013 2:32 pm Jason-Vic Vetra43 Our colour browising went on fine this saturday. We are trying to have a look at different bricks etc, I must admit we are really poor in visualizing how these things are going to look on a big picture. Everything looks fine on a small area. Any help? Also people who are building affinity homes, does anybody know what are the different kitchen cupboard options offered as standard? Think everyone suffers from trying to visualize it all on a large scale - not sure how to help there. What aspect of the cupboards and which ones specifically? When we got more detailed plans at the color meeting, it showed the design of the cabinetry. (Which was different to the display home - which the sales consultant made clear to us and it was a good change too). An option we elected to, which was free was to convert the microwave prevision to a normal draw. Other than that, any changes/variation will most likely incur cost. There is a standard changes sheet that you can get from Carlisle (we got ours from the display) that allows upgrades to butlers pantry and alternative shelving - all incurred a decent charge) Thanks a lot Jason. I was after the different configuration options (standard and options that are free of cost) for over head cupboards, potdraws island bench etc. ALso speaking of microwave provision, is it just a laminate open shelf they call as microwave provision? Not sure how it looks because all display ones are shown with prefitted technika MW, which we don't want. Do you have nay pictures if you don't mind? 0 4972 We are at the stage on our build in Kilcoy, Queensland where we need to get our fencing installed but we cant get any contact details for our neighbours to give them… 0 6144 You should check your detail drawings, it may show downpipe within brick pier. 14 14078 |