As I am waiting for the work on my frame to begin, the question I have is what is the minimum safe period of time that needs to pass for the slab to be ready to be built on? Two storey house is being built by the way.
I've been told a lot of different things about it which vary quite a bit. Some say you can start almost immediately, as the pine is very light and doesn't pose any danger for the slab.
Some say a week or so break in between is best allowed.
Whereas some say as much as 3 weeks are required.
Any builders out there who can shed some light on where the truth is?