Browse Forums Building A New House Re: Another Santorini 26 by *M*-Dream turning into a NIGHTMA 321Dec 16, 2010 7:52 am Building: Santorini 26 with M*tricon Where:VIC Site Cut 29/09/09 Slab Complete 09/10/09 Frame Complete 22/10/09 LockUp Complete 17/11/09 Fixing Complete 03/12/09 **My Thread:[/i] viewtopic.php?f=31&t=23110 Re: Another Santorini 26 by *M*-Dream turning into a NIGHTMA 322Dec 16, 2010 8:02 am Forum thread viewtopic.php?f=31&t=22300 Re: Another Santorini 26 by *M*-Dream turning into a NIGHTMA 324Jan 20, 2011 12:31 pm Metricon Riva 33 - http://herlihy-riva.blogspot.com Site start 15/03/2010 - Handover 23/12/2010 9 months and 8 days (284 calendar days) from site start to handover Re: Another Santorini 26 by *M*-Dream turning into a NIGHTMA 325Jan 31, 2011 6:39 pm Sorry to hear about your drama's Shelz. It sounds to me that your slab has heaved. This normally occurs when water pools beside a house, the ground was poorly compacted and numerous other reasons. You are not alone as we have gone through the same thing (all though we have not taken handover yet), until the decide to address all the issues we have and write into our structural guarantee that they will cover slab heaving due to their negligence. We have had nothing but dramas with this * company, because i pick up on all the defects and them not following building regulations. We had 30-40 defects at preplaster and also caught them screwing bottles into our stud cavities. If you need anymore advice on this matter or reference material just PM me or check out our blog. I use Tramex moisture meter and it will tell me instantly if the wall is cement sheet or plaster or masonite but most people dont have the equipment. 5 7062 the step up is 30mm and wanting it to be flat . how much does the concrete have to be lowered .we plan on removing bath and lenghten shower and adding seat. the old bath… 0 11829 8 6119 |