Hey everyone,
We are building a house with HBC in Butler and we are not far off the lockup stage. The roof is on, the walls have the grey plaster (I believe its called floating plaster?). I have been told it is the white plaster next & the ceilings then we should be in lockup.
We are getting the front elevation rendered. When do they do this? Do they use the plasterer now to do it before the windows/doors go in or do they do this at the end?
Thanks!!!
Jade