Thought I should start a thread of my own instead of just gatecrashing every one elses
I was going to wait for formal approval but since you practically have the house built before that happens I think I will start a progress one.
We are building (myself, my sister and her partner) at Byford The Glades in Perth WA with HBC. We are building the entertainer195. We have made a few changes with the plan. Knocked out one of the bedroom walls and extended the activity room to be bigger. Had to extend the garage as we have to have storage as part of our estate covenants. Double doors to the theatre as that is being changed into a playroom come spare room. Hopefully getting the ceiling in the living area raised and a heap of other cupboards etc added.
With our estate front landscaping and rear and side fencing is included. We have to have a tiled roof (not allowed to be black or too dark) We have to have a water tanks installed.. tank is included, plumbing it in is extra cost. We have to have eaves, floorings and window treatments (keystart reqd). We get a telstra package included.
Right now am awaiting formal approval through keystart who take forever of course lol. The plans have been sent to them and we are waiting on valuation etc
Have to go visit the tile, blind and brick places to make our choices.
We will more than likely go with one of the red range of bricks with cream/beige coloured trims
Inside will more than likely be warm colours as well beige and creams.