Browse Forums Building A New House 1 Jun 18, 2009 9:39 am People do it all the time. But I wouldn't worry too much, surely your builder provides a powerpoint as standard in the fridge space. I've never heard of one that doesn't. I leave you to fend for yourself, figure things out yourself. Terrence Malick Re: Asking the Tradies to do Cash on Hand minor mods on site 2Jun 18, 2009 9:56 am We decided to add a decorative arch after house was started and asked the plasterer to do it, which he did on the weekend, in his own time, and we paid him an agreed cash price. This was with full consent of builder, they suggested it in fact and arranged for house to be open for plasterer to have access. However I agree with Joles - Desmond, check your electrical plan first, I too would be very surprised if it does not include a power point in fridge space - unless you are putting fridge somewhere other than in its regular position Elvis has left the building... The site supervisor quit after 2 month on the project. I guess he was just instructed to bark at people, but didn't like when he was… 26 20828 Hi team, Im looking for a second hand sd4b monitor preferably white. 0 8900 If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 4445 |