Browse Forums Building A New House Re: M3tricon Site Vistit - FINAL TIPS? 8Apr 29, 2009 7:00 pm Site visit went well. Our site is almost dead flat so will only require a site scrape. HOWEVER a nearby M house that was recently built has a H class slab...any idea of how much this would set us back? Our Sales Consultant said that there is no chance of saying what type of slab we will require as the soil is ever changing in our highly volcanic area! We have also resolved my 5% issue - the sales consultant offered it before we even had to ask for the 5% to be applied to the slab payment YAY! We are also going to push our contract through before the 30th of June and bypass studio M, then add the Studio M additions later on with a variation at no cost to us...thats what he said but I asked him to double check it We will have to pay for the Studio M updgrades out of our own pocket at the final payment but as we are not looking to upgrade much that shouldn't be a problem. YAY exciting!!! I am finally seeing the light at the end of the planning tunnel that leads to another tunnel of the building process Building our FIRST HOME - M3tricon Santorini 29 on 2 acres just West of Warrnambool Just be careful with building stability during construction, that is when the structure may be weakened, refer to your engineering drawings for stability methodology. 1 7226 Thank you so much. This has been very helpful. We definitely wish to settle and get these people out of our life. They are trying to charge us interest on late… 7 14264 Title: Expert Tips for Painting Your Own House: Insights from Brisbane Painting… 0 273 |