Hey guys,
Just got a few queries. We're are building a house on stumps with Metri*** on the house Santorini 29.
1. The advertised build duration was 18 weeks for houses built with slabs. However, as we are building on stumps, the build duration stated on the contract is 41 weeks!! Which is a complete shock. Does anyone know or having the same situation?
2. Is it normal to not have a specified start date on the contract? I felt this is really weird. M can just drag and drag on. The 41 weeks is not including applying for the building contract and site start arrangments which could be an addditional 9 weeks.
3. And for building on stumps, in the contract (which has a structural guarantee of 25 years), if the stumps make noises(e.g walking), that is not included in the guarantee. According to the CSO, its only guaranteed if we walk halfway and the stumps breaks or something, then its covered. Is all of this normal ?
Kindly advise or share your experiences. Greatly appreciated.