We have sold our house as the 6th (!!!!!) site supervisor told us we would be moving in in March
We are not even at plaster stage.
I have tried calling the directors of the comany but they refuse to talk to me
This has happened so far:
- rock dug up but not remove
slab pured incorrectly
frame put up incorreclty
frame engineered incorrectly
brickwork abysmal
engineers plans ignored
disgruntled subcontractor sawed through 7 roof beams
the list goes on
I will be homeless fromnext month even though I gave them a 2 month buffer.
WHAT DO I DO? I
I am happy to name and shame the company as everything that I have said is factually correct. Kevin has been excellent in picking everything up but is appalled at how this company is behaving -they are trying to correct but the resuolts are abysmal