We have just started building 3 weeks ago and have a slab and we are now waiting for the framing to start (have been waiting a week)
We have gone with the basic plan with a few small changes. We moved the location of the fridge opening and made it bigger, changed the powder room into a walk in store room and moved around some of the windows.
We are building on a 940m block so we will have 12.5 metres to the back fence from the back of the house and 7.5 metres out the side of the alfresco which faces east.
Anyone else building/ built the Carrington?