Browse Forums Building A New House Re: Anyone build/buildiing with Scott Park Home(perth) 821Apr 30, 2010 10:41 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Anyone build/buildiing with Scott Park Home(perth) 824May 02, 2010 11:25 am SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Anyone build/buildiing with Scott Park Home(perth) 826May 02, 2010 12:05 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Anyone build/buildiing with Scott Park Home(perth) 827May 02, 2010 12:08 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Anyone build/buildiing with Scott Park Home(perth) 828May 02, 2010 3:44 pm Cooper's Build - Perth NOR viewtopic.php?f=31&t=30525 Prelim- mid Sept 2009, Pre Start 2 Feb, Siteworks- 21 April 2010, Slab- 10 May, Deliveries- all by 26 May Bricking- 28 May - 26 June, Roof complete 5 Aug, Float 28 Aug, Lock up 16 Sept Cabinets 1 Oct, Tiling 22 Oct, PCI 18 Nov, KEYS 3 Dec 2010 MOVED IN 17 DEC 2010 Re: Anyone build/buildiing with Scott Park Home(perth) 830May 02, 2010 7:51 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Anyone build/buildiing with Scott Park Home(perth) 832May 08, 2010 9:35 pm SEZZA'S BANKSIA DESIGNER viewtopic.php?f=31&t=33423 Building with SPH SOR - Baldivis. 3/5/10 Prestart 30/5/10 Final Plans Arrive 18/8/10 Siteworks 26/8/10 Slab 14/9/10-14/10/10 Bricks (2 Man Team) 25/10/10 Roof Frame and Roof Tiles 15/11/10 Rendering -Inside walls and Front of House Lock up and Locked Out!!! 10/12[/size] Re: Anyone build/buildiing with Scott Park Home(perth) 833May 21, 2010 1:20 pm My build: viewtopic.php?f=31&t=33640&p=476552#p476552 Prelim signed 23Dec09 Contract signed 18May10 Earthworks Building Licence 13Aug10 Earthworks Started 11Oct10 Building Licence issued 11Nov10 Slab 18Jan11 Bricking Started 16Feb11 Re: Anyone build/buildiing with Scott Park Home(perth) 834May 21, 2010 1:33 pm Building with Ventura homes (WA) Building thread: viewtopic.php?f=31&t=20516 Slab: 17/04/10, Bricking started: 12/05/10, Bricking finished: 2/06/10, Roof frame done: 11/06/10, Colorbond on: 14/07/10, Lock Up: 19/08/10, Cabinets: 25/08/10, Tiling done: 28/09/10, Electrical: 2/10/10, PCI: 29/10/10, Keys: 4/11/10 Re: Anyone build/buildiing with Scott Park Home(perth) 835May 21, 2010 1:50 pm My build: viewtopic.php?f=31&t=33640&p=476552#p476552 Prelim signed 23Dec09 Contract signed 18May10 Earthworks Building Licence 13Aug10 Earthworks Started 11Oct10 Building Licence issued 11Nov10 Slab 18Jan11 Bricking Started 16Feb11 Re: Anyone build/buildiing with Scott Park Home(perth) 839May 28, 2010 2:50 pm sezza anyone one here choosen lundy grey as the render.. and what do ya think???? Hi Sezza, We have used lundy grey color on our render. I can post some pictures if you want. I think I had posted them already. Cheers Tama Re: Anyone build/buildiing with Scott Park Home(perth) 840May 28, 2010 3:02 pm Hi Guys, We have finally moved to our new house. Still havent got internet, lucky got the landline shifted, and then came to know that I cant ADSL2 due to the location(Canning Vale Exchange). Has any one got ADSL2 in Canning Vale. We did the painting ourself, it was exciting but hard at cutting edges. We made a mess on the tiles in laundry. There were few drops of sealant on the tiles, and it was hard getting them out. Got the tiling done, electrical fittings, had to get rid of excess sand around the house, I was surprised it was almost 3 truck loads. We still have to install laminate flooring in bedrooms. It was nightmare cleaning the dust comming of the slab. So we had to seal the slab with Bondcrete till we put laminate flooring. Looking for a paver to do some paving. How much does it cost approx per sqm. Then we need to sort out landscapping also.. The list is never ending.. I am building in claymore NSW and this is shown in the building envelope plan. … 0 10016 If so what were the "special circumstances" under which it was granted? "Note: If the development consent is for 'dual occupancy' an owner-builder permit can only be… 0 13992 |