Browse Forums Building A New House Re: Electrical connection question --Over-head electrical works 7Nov 26, 2008 4:51 pm Quote: Does not include authority connection fees... It may be refer to over-head electrical works which you will get a separate quota from the Builder's electrician, like me. Re: Electrical connection question --Over-head electrical works 9Nov 26, 2008 10:18 pm rldragon2003 eho Hi, I am building with Clarendon too. I have to pay for the connection myself and that costs me around $750. Did you do it by your own electrician, or through the builder's electrician? Builder's electrician just calls given a quote of $890. It's through the builder's electrician. I got the quote some time after the slab was done. Building Clarendon Brighton - Done and moved in Sept 2009 Re: Electrical connection question --Over-head electrical works 10Nov 27, 2008 9:25 am Maxie Ours was $650 - think it depends which network area you live in. What about the gas connection? Did you need to pay it? Did you do the hand over on spot or at the north west office? Thanks for info, yes met with Power Utility, Builder's Site Supervisor and Electrician on site and aligned on the mains connection. Seems like the builder and Electrician… 2 10031 If there have been changes, variations, during construction then the drawings should be revised, the building permit amended and the current, as built drawings given to… 2 2731 I'll look into different shower heads and ask the plumber about some engineering and see what he says. Thanks 2 6205 |