Shouldn't be a problem. If you are using Colorbond, your roof weights around 5 kg/m2. Roof trusses like that are generally designed to carry bigger loads and are oftentimes placed at 0.9 m intervals. In your case they are at 0.6 m?
Shouldn't be a problem. If you are using Colorbond, your roof weights around 5 kg/m2. Roof trusses like that are generally designed to carry bigger loads and are oftentimes placed at 0.9 m intervals. In your case they are at 0.6 m?
I wouldn't have to worry.
Yep colourbond roof and 600 apart. I do wonder when the frames go up and it’s seen why don’t they repair/replace it. I guess it isn’t an issue. Thanks