Hi,
Building a waffle pod slab (m class) on piers due to historical uncontrolled fill. Pretty much flat land. I am on the highest point - ie no slope towards my slab.
Builder used crusher dust (not compacted) with a plastic sheet around the perimeter.
Is that even suitable? I thought crusher dust is porous? He also omitted the garage portion saying that driveway doing to be poured later?
I feel that area should be protected as well given its storm season.
The site can be quite muddy but does dry quickly within 1 day once rain stops.
Thanks
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅
Like ⋅ Add a comment ⋅ Pin to Ideaboard ⋅