Hi Experts,
I am planning to build 30sq double storey home. my land is very much flat and rectangular size.
I know concrete Pier depth will be as per geotech report and engineer design.
My builder quote says upto 90 linear meter included. 110$/ linear meter for anything extra.
I have asked my builder to use all the 90 linear meter allowance and waiting for the reply.
Will the builder generally utilize the remaining linear meters or they will always go as per engineer design.
I dont want to waste the unused linear meters allowance and want the entire 90 linear meter allowance for slabs.
Appreciate the expert advise on this. thanks.